William P. Ferrell, EI
Work History Chas. H. Sells, Inc. (Now WSP SELLS), Cary, NC Senior Project Engineer 10/2006 10/2008Project Engineer 10/2003 10/2006
Summary Used Land development desktop 2008 and 2004, Watercad, Hydraflow Storm Sewers, Hydraflow Hydrographs, Hec-ras, Microsoft Excel, Microsoft Word and Flowmaster, to design water lines, sanitary sewer lines, storm drainage systems, wet detention ponds, stormwater wetlands, extended dry detention ponds, road widening plans, grading, and perform flood studies associated with land development projects. Performed fire flow test. Computed survey staking. Visited job sites for Construction Administration and As Built Certification.
Projects Quail Crossing Shopping Center, Wake Forest, NC. Performed flood study for Smith Creek to access impacts of fill on the 100 year flood plain, converted existing HEC-2 model to HEC-RAS, updated model based on highway relocation, and added cross sections. Modeled storm drain flows for pipe sizing. Computed cross sections and grading for road widening plan. Designed City of Raleigh Sanitary Sewer. Stonehouse, James City County, VA. Designed Culverts for Stonehouse Parkway with drainage areas from 3 acres to 4 square miles. Provided cost estimate for large culvert in lieu of a bridge. Long Leaf Mall Shopping Center, Wilmington, NC. Computed fire flow analysis for new services on existing water system. Produced NCDENR Permitting for water and Sanitary Sewer. Sea Wynde Plantation Phase II, Shallotte, NC. Designed street profiles, storm drainage and erosion control for this coastal subdivision. Performed water system analysis. Ashton Hall Subdivision, Durham, NC. Performed flood study of non regulatory stream. Designed water system and Performed fire flow analysis for 10 phase, 330 lot subdivision. Designed storm drain collection system. Designed street profiles. Produced grading plans, road widening plans and NCDOT permitting. Visited site for CA and As Built Certification. Produced cost opinion and Engineering as built drawings. Beckwith Amenity Center, Apex, NC. Produced grading and utility plans for this multi subdivision recreation center for Toll Brothers. FedEx Ground, Durham, NC. Designed 3 Extended Dry Detention Basins. Designed waterlines/firelines, including watercad model, and road widening plan. Inspected BMPs. New Residence Hall for Campbell University, Buies Creek, NC. Prepared Engineering plans for water, sewer, grading, drainage, sediment & erosion control and road widening. The Peninsula at Amberly PUD, Cary, NC. Inspected BMPs. Drew offsite waterline plan and profile.
Niall Gillespie, PLS, Land SurveyingSurvey Tech9/1994-10/2003
Used AutoCAD 2000, LI Contour and Profiler, Simplicity Systems Cogo: Survey3, Survey 4, and Sight Survey, and GIS map viewers to establish, investigate and reestablish land boundaries, prepared plots and legal descriptions for tracts of land. Produced subdivision, as built, and office condominium plats. Computed construction staking. Surveyed Beaver creek for flood study (LOMR). Created cross sections for engineer. Designed subdivision streets, drainage, grading, and lot layouts. Prepared topographic surveys for community service projects: church, rescue mission. Voice Telecommunications, Eden, NCTechnician7/1989-9/1994
Installed and maintained business telephone and paging systems for various government agencies including State/Local Health Clinics, State Department of Transportation Maintenance Facilities, and Community Colleges. Trained customers on equipment use. Donated time installing a telephone system at a school for the developmentally disabled.
North Carolina State University, Raleigh, NCTeaching Assistant9/1987-5/1989
Taught construction materials lab including lecture and supervision of laboratory experiments for three consecutive semesters.
NC Department of Transportation, Raleigh, NCEngineering Assistant7/1987-8/1987
Developed utility plans for highway construction projects.
NC Department of Transportation, Raleigh, NCEngineering Associate5/1986-8/1986
Slope staking, staking for finish grade, and storm sewer staking. Served as team lead of survey crew on highway construction project.
Education
Undergraduate Studies: North Carolina State University, Raleigh, NC
B.S.C.E, Civil Engineering 1987Graduate Studies: North Carolina State University, Raleigh, NC
Degree: Civil Engineering with emphasis on Structures and Transportation Research Fellow with Federal Highway Administration in McLean, Virginia Training: Land Desktop 2008 Stormwater BMP Inspection & Maintenance Certification Advanced Stormwater BMP Designed Sediment & Erosion Control Workshop AutoCAD Grading
Self taught: AutoCAD LDD WaterCAD Hydraflow Storm Sewers Hydraflow Hydrographs HEC-RAS
Registrations: EI-NC January 1988
Certification: Certified Stormwater BMP Inspection & Maintenance Professional July 2007 Professional Affiliations American Society of Civil Engineers North Carolina Water Resources Association Institute of Transportation Engineers Chi Epsilon More Projects
Governors Station Shopping Center, Morehead City, NC. Performed fire flow analysis for water system. Wakefield Park-Rex Campus, Harris Teeter, Raleigh, NC. Performed storm drainage calculations. The Landing at Southpoint Condominiums, Durham, NC. Designed storm drainage, grading, waterlines and road widening. Amberly MF-1, Cary, NC. Designed 5 stormwater wetlands. Designed sanitary sewer and water lines. Stonewater Village Center, Cary, NC. Layout utility lines. Produced NCDOT driveway permits. Little Pros Academy-Dunn Road, Raleigh, NC. Produced NCDOT driveway permits. The Landing at Lake Michael Subdivision, Mebane, NC. Prepared engineering plans for water, sewer, and grading. Performed flood study for 42' wide bottomless culvert. Garland C. Norris Company, expansion, Apex, NC. Performed fire flow analysis. Village square at Amberly, Cary, NC. Drew lot layout. Designed sewer. RBC Bank, Brier Creek, Raleigh, NC. Prepared plans for grading and drainage. Harmony Subdivision, Cary, NC. Designed preliminary lot layout, erosion control, drainage. King Property Rezoning, Durham, NC. Drew concept plans for Pulte Homes. Farrington Road Townhomes Rezoning, Durham, NC. Drew concept plans for Beazer Homes. Produce Cost opinion. Stratford Pointe Apartments, Rockingham, NC. Conceptual plan for sewer and grading. Carrington Ridge Apartments, Forest City, NC. Conceptual plan for sewer, water, drainage and grading. Magnolia Pointe Apartments, Durham, NC. Prepared Engineering plans for grading, drainage, sediment & erosion control, road widening. Performed fire flow analysis for waterlines. Prepared bid documents and specifications for road widening. Performed Cost opinion. Abberly Place Apartments, Mooresville, NC. Prepared Engineering plans for water, sewer, sediment & erosion control, road widening. Performed fire flow analysis for waterlines. Blackstone at Amberly and Carolina Preserve, Cary, NC. Prepared Engineering plans for lot layout, sewer, water, and sediment & erosion control. Performed fire flow analysis for waterlines, Carolina Preserve phase 1. NCSU Alumni Center, Raleigh, NC. Drew plans for water, sewer, drainage, erosion control and stormwater wet pond. I-40 Rest Area, Warsaw, NC. Drew Construction plans for water and sewer. Conceptually planned low flow water system.
|