121 Baldwin Dr. Washougal, WA 98671 Phone: 360/213-6142 E-mail: RLC1212[at]aol.com Ron Campbell ObjectiveSeeking an opportunity to utilize my past work experience and skills in the Heavy Industrial and Power Generation industry as a Site Project Manager/ Construction Manager / Project Superintendent/ Outage Coordinator / Estimator/Sales and Marketing Rep. Work experienceJan. 09 to Present Construction Manager, LotusWorks, Vancouver, WA Current assignment: Site Project Manager, Dry Forks Station 480MW Greenfield Power Generation project in Gillette, WY CM contract position for Westcon Industries, Bismarck, ND 24M BOP Balance of Plant piping installation contract with BEPC- Basin Electric Power Coop. Site project management responsibilities of safety, quality, schedule, and cost control. On site management of 22-support staff, 127- direct hire craft and 3-subcontractors. Daily contract management and customer relations duties and responsibilities. Aug. 08 to Dec. 08 PSEG, Public Service Electric & Gas - Newark, NJ Construction Manager, Construction Div. Management of scheduled planned annual outage at Mercer Generating Station unit #2, Trenton, NJ and seven small Plant Betterment Projects. Coordination with Capital Projects, contractor Shaw Group, for tie-in of new back end technology clean air project, FGD and associated equipment. Nov. 07 to July 08 Black & Veatch Construction Inc. Antioch, CA HRSG Superintendent 2 X 1 Combined Cycle Vogt-Nem HRSGs On site contractor coordination of (2) HRSGs and the Erection. Change order cost evaluation and negotiations. Provide technical direction of HRSG erection and BOP High energy piping systems. Project coordination of multiple subcontractors. July 2006 to Oct. 2007 Irwin Industries Inc. Long Beach, CA Project Manager/Estimator- Power Plant Services Div. Estimator for scheduled planned outages and capital equipment installations on fossil/coal fired generating units. Proposal development and presentations to include manpower projections, work breakdown structures, CPM schedules and associated detailed cost estimates. Site Project Manager for the installation of GE - LM6000 simple cycle and SCR, Greenfield project. Management of multi-subcontractors Union Building trades and field management staff of 15 project support personnel.
Nov. 2005 to June 2006 MBEngineers Inc. Salt Lake City, Utah Sr. Construction Manager Duke Energy Moss Landing Power Plant, Moss Landing, CA Fast track installation Project, EPC of Nebraska package boiler D-type 99,000 pph, to include new economizer, structural steel support steel, and piping systems installations. Planning, scheduling, and project controls responsibilities. Subcontractor coordination and interface with plant operations/maintenance departments. Enforcement of ASME welding codes and standards, quality control and safety reviews. Nov.2003 to Sept. 2005 Enerfab Oconto Falls, WI Manager Power Div. - Boiler maintenance and repair contracting. Business development, Firm price/Lump sum estimating and Site project management responsibilities. Wisconsin div. branch manager after the assets only purchase of 110 year old mechanical contracting firm, Phillips Getschow Company. Managed client relations and bid proposal development for various customers in Wisconsin. Alliant Energy, Wisconsin Public Services and Wisconsin Energy. Bid and managed Boiler maintenance projects at several Pulp & Paper mills such as Georgia Pacific, Appleton Coatings, and Domtar Paper. Sept. 2002 to Nov. 2003 Key Technical Solutions, Inc. Madison, WI Mechanical Boiler Engineer/Outage Coordinator/Estimator Alliant Energy WI Power & Light, Wisconsin & Iowa generating stations. Provided shift coverage for planned major maintenance outages and Capital Improvement Projects at Nelson Dewey Generating Station Cassville, WI Project Engineer for coordination for various site contractors and interface between Plant Operations and Maintenance departments. Installation of Over Fired Air System (OFA) for Nox Reduction. Replacement of re-entry throats and (6) Cyclone Burners. Design, modification and upgrade of various piping systems. P&IDs updates and isometric field sketch development, with associated materials list. 2001-2002Frank LILL & Son Inc.Webster, N.Y. Project Manager / Estimator HRSG erection 2-units Foster Wheeler, BOP equipment installation, BOP field/site piping fabrication and installation. Site representative for contractor during the construction of 2X1 combined cycle power plant in Newington, NH. Planning/ scheduling of equipment, materials, manpower. On site office management, contract administration, processing and tracking RFIs and FCN extra work, change order log control, negotiation and processing. Material take offs and labor cost calculations for approved change orders, and extra work scope tasks.
1997-2001 General Equipment Mechanical LLC. Vancouver, WA Construction Manager / Estimator / Sales Review RFQs plans, drawings, and specifications and estimate materials and labor for lump sum/firm price quotations.bid preparation and proposal presentations Project management, client and labor relations responsibilities Managed multiple projects and maintained profit center for companies Heavy Industrial Div., Boiler repair and Piping systems installations.
1992-1997 Industra Services Corp. Portland, OR Project Manager / Estimator/ Sales Rep. Expanded companys capability to include piping fabrication and installation. Estimated firm price / lump sum and time and materials bid requests RFQs. Bid proposal presentations, subcontractor bid solicitations. Project management for shutdown and boiler outages. Power, Hog fueled and Recovery boilers.
1988-1992 West Coast Mechanical Inc. Portland, OR Construction Manager / Estimator/ Sales Pre bid work scope reviews, estimating firm price / lump sum and time and materials projects. Solicited subcontractors bids, subcontractor negotiations, pre construction planning and project plan review with craft labor and supervision. Bid preparation / proposals presentations and project contract administration. Project management of multiple projects, successfully meeting or exceeding project goals. Hog fuel and power boiler experience. 1985-1988 McCambridge Mechanical Inc. Vancouver, WA Construction Manager Boiler & Steam Turbine installations / maintenance and repair contractor. Estimating of piping systems fabrication and installations, bid preparation and submittals for main steam, condensate, lube oil and associated piping systems. Lump sum / firm price quotations. Project management for boiler outage and piping installation projects, craft labor supervision and management. Provided Steam turbine installation and repair technical direction and support.
1983-1985 Power Maintenance Inc. Paramount, CA Project Superintendent / Estimator HRSG / Power boiler installation maintenance and repair. Performed new installations, scheduled maintenance and emergency repairs. Field supervision of craft labor, Millwrights, Boilermakers, and Pipefitters. Bid preparation / firm price, unit pricing, and time and materials estimates. Managed and supervised various projects at Southern California Edison across the entire Power Generation fleet.
1973-1983 Boilermakers Local # 104 Seattle, WA Field Const. Apprenticeship Graduate and Journeyman Craftsmen 1983 2009 Boilermakers Local # 242 Spokane, WA. This period of time provided work experience as a journeyman Boilermaker in various types of Heavy Industrial construction, maintenance and repair. Petro-Chemical refinery, Boiler erection, maintenance/repair petro-chemical Maintenance and nuclear power plant construction & scheduled outages.
Babcock & Wilcox Const. Co. - Boilermaker GF - Boiler Erection Bechtel Power Corp. - Boilermaker FM - Nuclear Plant Const. J.A.Jones Services Co. Boilermaker - Boiler maint./repair Pittsburgh-Des Moines Steel Co. - Boilermaker FM - Nuclear Power Const. Far-West Mechanical Inc. - QA/QC Welding inspector - Nuclear Const. Snelson Construction Co. - Boilermaker FM - Petro/Chemical maint. Clark-Ullman Welding - BM/Welder Foreman - Boiler maint. /repair Bostrom / Bergen Metal Products - QA Inspector - Nuclear Power Const. Chicago Bridge & Iron Co. - Boilermaker/Welder - Petro Tank Const.
Member Boilermakers Local #242 Spokane, WA. Reg.# 1773409 RETIRED JULY 2009
Summary of qualifications36 plus years of Heavy Industrial Construction experience. The ability to staff and manage a project site with known professionals. The ability to manage contractual obligations, while managing project risks and opportunities. The ability to review drawings, plans and contract specifications and perform quantity material take offs, calculate man-hours and labor cost - all in an effort to provide a detailed cost quotation/estimate. I have the ability to develop and interpret CPM schedules. I have the ability to supervise, coordinate, and sequence project work activities to minimize interference between various trades and contractors on projects. I can also provide technical input and support, to resolve potential construct-ability issues. I can develop WBS, work break down structures in support of estimates and proposals. I can act as Liaison between client/owners, engineers, subcontractors, and craft labor in an effort to ensure that project construction complies with drawings and specifications in support of project schedules overall quality and project costs. I have the ability to support Sales and Business Development activities from both a technical and commercial standpoint.
Education1980 Graduate Associated General Contractors Supervisory Training Program 1978 Graduate Boilermakers Field Construction Apprenticeship Training Program AFL-CIO Building Trades, 1973 to 1978
Personal Development1/99 Industrial Facility Self Assessment 12/04 Fundamentals of Purchasing and Best Value Procurement 8/05 Contract Claims & Litigation Avoidance 4/06 and 7/06 Engineering Project Management 3/07 Competition in Government Contracting and Subcontracting Military RecordU.S. Army Sept. 1969 to Sept. 1971 HONORABLE DISCHARGE VIETNAM VET Sept. 1970 to Aug. 1971 UH-1D Flight Platoon SGT. E-5 ReferencesGeorge Vilaro- Project Mgr. PSEG Newark, NJ 973/634-0965 Frank Cielo - Director of Projects PSEG Newark, NJ 973/479-9684 Rusty Ross Engineer Dynegy 831/633-6683 Gene Kiholm Construction Manager & Owners Rep. Southern California Edison 661 / 302-3815 Mark Bonasera, PE, Principal Engineer MbEngineers Inc. 831 / 760-0700 Danny Emel, Field Engineer, Zachary Construction 660/988-2203 John Crosby , Regional Manager Fresh Meadows Power 917/662-4803
|