ROBERT J STRYKER 9 Escutarsis Rd Lowell, ME 04439 Phone: (207) 794-5785
EDUCATION 2000-2001Community College of Rhode Island 1999-2000New England Institute/Mechanical Engineering
EMPLOYMENT 2008 - Present, Project Engineer for Performance Mechanical. Working on a Air liquide Hydrogen Plant project. Responsible for all RFIs, coordination of work, change orders and any field issues with the installation of mechanical piping and structural steel. Have to attend all customer and client meetings. Schedule all sub-contractors to perform their scope of work. Track fabrication from multiple fab shops and prioritize work to be performed.
2006 2008, Project Engineer for Ramsay Welding and Machine. Worked on many projects including Louisiana Pacific Expansion and Domtar Annual shutdowns. Responsible for overseeing structural and mechanical projects from start to finish, tracked material for fabrication shop and site, developed AutoCAD drawings for fabrication. Responsible for the bidding of new jobs and pricing of change orders. Created schedules and manpower requirements.
2004 2006, Project Manager for Dynamic Systems Inc. Worked on many process piping and mechanical piping jobs including Infineon Tool Hook-Up and IBM 323 Annex Base build. Responsible for material purchasing, Tracked material for fabrication shops and site, Isometric tracking and test package development. Responsible for the bidding of new jobs and pricing of change orders. Created schedules and manpower charts using Sure Trak and Expedition programs.
2003 2004, Project Manager, Arden Engineering Constructors Worked on the IPD Lab, MFS Upgrade mechanical piping projects as a Project Manager for Arden Engineering. Responsible for all coordination issues. Handle the purchasing of materials and equipment. Generated submittals and RFIs . Worked with the General Contractor on scheduling and manpower issues. Responsible for subcontracts and pricing of change orders.
2002 2003, Project Engineer, Arden Engineering Constructors Worked on the AMGEN Enbrel base build mechanical piping project as a Project Engineer for Arden Engineering. Responsible for the handling of RFIs, equipment submittals, and coordination issues. Worked with Assistant Project Manager on pricing of Change Estimates and procurement. Generated daily logs for manpower scheduling. Worked as liaison with Subcontractors on conflicts in field. Reported to Project Manager on field changes and scheduling conflicts.
2001 2002, Mechanical Designer, Tech-Aid Worked at Proto-Power Corporation designing and modeling pipe systems for a Combined Cycle Power Plant. Developed Microstation component arrangements, prepared detailed drawings for fabrication and installation of piping, associated components, and pipe supports. Design applications including Micro Station/J, 3D Modeling, Plant Space Design Series and AutoCAD 2000.
2000-2001, Design Draftsman, Tech-Aid Worked at Davis Standard in the Wire and Cable Division drawing layout, assemblies and revision of extruding machines. Developed machine parts designs with the input of engineering. Drawing applications include AutoCad14 and AutoCad2000.
1997-2000, Design Draftsman, Fisher Controls Designed and drafted Butterfly Valves and all parts in coordination with engineering input. Produced layouts, assemblies and detail drawings in accordance with ANSI standards. Design applications include ME10, Solid Designer and CadKey.
1995 1997, Manager, Baco Corp/Midas Supervised workers to assure proper procedures were followed. Interacted with customers and wholesale suppliers on a daily basis. Responsible for customer scheduling, data entry and updating of inventory. Prepared all bank transactions for daily sales.
1988-1992, United States Marine Corp Performed various duties such as driving for dignitaries and flag officers. Provided security for Generals during conflict in Saudi Arabia. Worked with Special Operations Training Group for many operations.
|