PROFESSIONAL EXPERIENCE
Romalia Stone
Architectural Design/ Drafters/Estimator
Redondo Baech, CA May 2009- Present
1. San Antonio River Ctr
San Antonio TX
- Responsible in estimating the cost, quantity of materials needed in any given project.
-Responsible in giving bids on time to all contractors
Also cost and value engineering of the project and shop drawing
Romala Stone
Architectural Design/ Drafters/Estimator
Beverly Hills, CA May 2008- May 2009
2. Marriott Hotel
San Diego , California
- Responsible in estimating the cost, quantity of materials needed in any given project.
-Responsible in giving bids on time to all contractors
Also cost and value engineering of the project and shop drawing
Executive Stone Trading
Architectural Design/Drafter/Estimator
North Hollywood, CA April 2004- April 2008
1.Miami Hotel
Miami, Florida
-Responsible in marketing the most beautiful stone in the world, which is Jerusalem stone. Making sure that Architects, Designers, Contractors, and Developers that this stone can be used in floor, wall facade, column, Fire places and exterior paving.
Stone Mart Inc
Architectural Design/Drafter/Estimator
North Hollywood, CA July, 2002-April 2004
1.San Diego Ballpark
San Diego, Ca
2. Whittset, Coldwater Canyon, Califa Housing
Dev
North Hollywood, Ca
-Responsible in estimating the cost, quantity of materials needed in any given project.
-Responsible in giving bids on time to all contractors. Also cost and value engineering of the project
Carnevale & Lohr Inc.
Estimator/Project Coordinator /AutoCAD Designer/Inspector
Bell Garden, California June, 2000-July, 2002
1.Cathedral Lady of Angels
Temple St., Los Angeles, CA
2 Salk Institute
San Diego, Ca
3 American Airlines
Los Angeles, California
4. Hollywood Hotel (Renaissance)
Los Angeles, CA
-Responsible for coordinating all responsible person such as Installer, Setter, Project Architects, Contractors, Sub-contractors, Superintendent and Owner would be in the pace and if there are change order making sure that they have the memo and copy of the change order and copy of the blue prints.
-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
-Responsible that the pieces specified on specific area would arrive at the jobsite on time. Making that the pieces is marked properly to identify these pieces to be set properly according to the drawings.
-Responsible in checking the drawings and all the missing pieces and submit to our shop for local fabrication.
DMG Marble & Granite
Architectural Design/Drafter/ SR Estimator
Sun Valley, California November 1996 - May 2000
1. Ana Hotel
San Francisco, Ca
2. Versa (Caesar Palace)
Las Vegas, NV
-Responsible estimating the cost of materials, freight cost and estimated time of delivery.
-Responsible for preparing AutoCAD drawing and cutting list for the factory.
-Responsible in coordinating the factory, Architectural department and Client of the time of delivery at the jobsite.
Globe Marble & Tile, Inc.
Sr. Estimator/ AutoCAD Technician
North Hollywood, California September, 1989-November 1996
1. Anahiem Arena, (The Fond)
Anaheim, California
2.Emerald Shaper(Pan Pacific Building)
San Diego, California
3.Grand Hyatt Wailea
Wailea, Hawaii
-Responsible estimating the cost of materials, freight cost and estimated time of delivery.
-Responsible for preparing drawing and cutting list for the factory.
-Responsible in coordinating the factory, Architectural department and Client of the time
of delivery at the jobsite.
-Responsible of preparing the master plan and AutoCAD drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
-Responsible that the pieces specified on specific area would arrive at the jobsite on time. Making that the pieces is marked properly to identify these pieces to be set properly according to the drawings.
-Responsible in checking the drawings and all the missing pieces and submit to our shop for local fabrication.
E.I.S.I. Structural/Mechanical Draftsman
Seattle, Washington September 1986-September 1989
1. Metro Northbase Interchange
Washington
2. Sieg Hall University of Washington
Seattle, WA
3. Skagit Valley College, Dept Gen
Admin.Washington
-Responsible Civil/Architectural Drawings for Commercial and School project.
-Responsible for Electrical/Mech. Drawings for Commercial and School projects.
-Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,
Mechanical part and etc.
-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
R & R Marble Inc. Estimator/Architectural Draftsman
Houston, Texas November 1984-September 1986
1 East Texas Saving
Tyler, Texas
2.Century National Bank
Houston Texas
3.One Ridgemar Center
Fort Worth, Texas
-Responsible for preparing AutoCAD drawing and cutting list for the factory
-Responsible for estimating the cost of materials and estimated time of delivery.
-Responsible in coordinating the factory, Architectural department and Client of the time of delivery at the jobsite.
-Responsible for development design, construction and alteration drawing.
And if there are change order making sure that they have the memo and copy of the the
change order and copy of the blue prints
-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
Dome Construction.
Architect/Estimator
Quezon City, Philippines February 1981-October 1984
1 H.R Lopez Warehouse
Pasig, Rizal
2. Lighthouse Pub & Restaurant
Quezon City, Philippines
-Responsible Civil/Architectural Drawings for Commercial project.
-Responsible for Electrical/Mech. Drawings for Commercial projects.
-Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,
Mechanical part and etc.
Responsible for construction and supervision
MSB Trading Inc.
Architect/Estimator
Manila, Philippines
January 1981-October 1977
1 H.R Lopez Warehouse
Pasig, Rizal
2. LightHouse Pub & Restaurant
Quezon City, Philippines
-Responsible Civil/Architectural Drawings for Commercial project.
-Responsible for Construction and supervision
-Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,
mechanical part and etc.
- Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
Ultima Development Corp
Architect/Estimator
Manila, Philippines January 1976-September 1977
1 South Green Park Townhouse
Paranaque, Philippines
-Responsible Civil/Architectural Drawings for Commercial & Residential project.
-Responsible for Construction and supervision
-Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,
Mechanical part and etc.
- Responsible of preparing the master plan and drawings will be change according to the
Change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.
J.R Zapanta and Asso. Architectural Draftsman/Estimator
Makati Philippines March 1976-April 1975
1 Baliuag Bulacan Circle
Bulacan, Philippines
2. Zeta Building
Makati, Philippines
-Responsible Civil/Architectural Drawings for Commercial project.
-Responsible for Construction and supervision
-Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,
Mechanical part and etc.
- Responsible of preparing the master plan and drawings will be change according to the specs.