Name : cstavish
Industry Type : Highway - Heavy Contractors
City & State : Chandler , AZ
Job Title Estimator / Project Manager
Relocation Preferences : ANY
Objective : I have a lot to offer , including 15+ years of experience in the construction industry with operations, estimating, crew management, and contract administration.
Asphalt, Concrete, and Aggregate
I possess the knowledge of all three product lines. I also have a strong history in estimating, marketing, sales and billing of said operations. Excavation, soils reports, day to day operation specifications as well as managing crew employees and multiple subcontractors which performed such duties as milling, traffic control, striping, seal-coating, and traffic signal installation
I regularly oversaw multiple projects at one time and have a proven record of bringing in work under estimating budget. I am actively seeking a new opportunity with a great company, relocation is not an issue. Some specific accomplishments include:
Primary bidder on all hard bid street improvement projects ranging from $250k to $7 Million
Charged with managing our regions highest profile projects annually. Most recent being $8.8 million consisting of 105 k Tons HMA, 700k SY of milling, striping, electric, and traffic control.
Ability to continually keep projects on schedule. I continually monitor short and long term schedules and communicate with internal and external parties to ensure the project runs smoothly.
Proven track record of meeting and exceeding estimated margins. I have averaged a margin increase of 2% over estimate over the last 4 years
Knowledge and ability to manage subcontractors in a variety of fields. This includes milling, striping, traffic control, fencing, erosion control, electrical, etc.

I am eager to speak with you. Ive enclosed my resume for your review. I look forward to hearing from you and will be happy to answer any questions you may have.
Sincerely,
Casey Stavish
Resume :  
Casey Stavish
Objective:

  
A Project Management / Estimator Position with potential for advancement

Education

  
1986-1990     Germantown High School     Germantown, TN
1991-1992    Arapahoe Community College      Littleton, CO
1992-1993     Mesa Community College      Mesa, AZ
1993-1995     University of Colorado     Denver, CO

Professional experience

  
March 2008 -  Feb 2009  Ace Asphalt of Arizona        Phoenix, AZ
Project Manager / Estimator
Estimate and run new construction ground up projects
Sales focus to retain customer base
  
2003-Feb 2008    Lafarge West, Inc.        Denver, CO
Project Manager
Prepare all aspects of City, Municipal, State reconstruct projects ($1-$10 Million)
Manage sub-contractors, schedule, and on-site activities
Monitor crew and trucking costs, material yields, payment applications
  
2002 - 2003     Lafarge West, Inc.          Denver, CO
Scheduling / Logistics Manager
Coordinate daily activities of paving, grading, trench, and patch crews.
Kept budget, backlog, daily performance, and safety logs up to date.
Communicated with Sales team on schedules, performance figures.
Implement needed changes and improvements.
2000 - 2002     Lafarge West, Inc.      Denver, CO
Field Grading Superintendent
Responsible for 850,000+ job-cost square yards annually.
Responsible for 3 direct reports and 18 second level employees.
Responsible for coordinating activities of 3 field crews.
Manage $1.8 million in assets.
1997 - 1999     Lafarge West, Inc.      Denver, CO
Quality Control Technician
Performed sampling, testing for all super-pave mix designs.
Performed testing, sampling for all aggregates nationwide.





References





Kevin Vonesh Marketing Director 303.657.4288

Michelle jorissen--  Senior contract administrator    303.994.6646

Dennis Ruff --    Project manager    303.944.4637

Dennis martinez--    Project Estimator    303.944.4631

Darold Fischer--    grading Superintendent    303.435.5756



CERTIFICATIONS / QUALIFICATIONS


Supervisory Education Training
Storm-Water Management During Construction
Traffic Control Supervisor
OSHA Rights & Responsibilities of Supervisors
MUTCD Knowledge
Microsoft Excel 2003 (Level 1,2,3)
Microsoft Project
Microsoft Word
Advanced Driving Safety Seminar (Smith Driver Training)
DOT Drug and Alcohol Reasonable Suspicion Training
Colorado Asphalt Technician Certification A,B,C,D
HCSS Estimating Software
Dust Control Supervision
CDOT, ADOT Specification Knowledge / Experience





Project List
2009
Municipal Improvement Estimates
       During my employment at Ace Asphalt I was also the primary bidder on all hard bid projects mainly consisting of city/municipal street improvement programs. Some worthy of noting:
2009 City of Phoenix Arterial Overlay Result (3rd out of 11 bids )
2009 City of Phoenix residential Overlay Program Result (3rd out of 10+ bids )
2009 Town of El Mirage Residential Rehab Program Result ( Winning Bid )
2008  
Brost Office Warehouse - Site grading, pad prep, sub-grade, concrete , asphalt, striping
Sigler Office Complex - Clear, grub, site grading, pad prep, sub-grade, concrete , asphalt, striping
Junior Achievement - Clear, grub, site grading, pad prep, sub-grade, concrete , asphalt, striping
Lot Expansion, Hilton  - Sub-grade, concrete , asphalt, striping
Homewood Suites - Clear, grub, site grading, pad prep, sub-grade, concrete , asphalt, striping
Mahoney Office Complex - Clear, grub, site grading, pad prep, sub-grade, concrete , asphalt, striping
    The projects above are a few that I was mainly associated with during my tenure at Ace Asphalt. All of these jobs started from an initial set of drawings, taken-off ( by others ), estimated and negotiated prior to construction. The construction cost range was from 150k-1.5 Million Our customer base consisted of both long term and newcomers.
    The above projects all consisted of ground up construction. Initial site work included site preparation, cuts / fills, over-excavation if required. The building pad preparation per soils report specs and all site concrete was within our scope followed by sub-grade preparation and asphalt or PCCP.  My main role in all of these projects was to work with the owners and coordinate construction. I also was responsible for billings, change orders and following up with punch-list items.
500- 18,000 CY of material cut/ filled or imported/exported on each project
All projects came in below estimate with regard to margins
Managed all aspects of our scope of construction



2007
City of Aurora Overlay Program
The primary role of the project was milling and overlay of various arterial, collector, and residential streets throughout the city. This particular project included several major arterial streets where traffic and general public was a main role of mine. I was in constant contact with local residents and businesses in order to ensure safety and good relations throughout the duration of the project
This project was approximately $9.0 Million and lasted 180 days. I was heavily involved in the initial bid process as well as field supervision of all field operations. I was responsible for all payment applications, change orders, lien waivers, and maintaining quantity information for all subcontractors. I maintained exclusive management of the schedule and my main goal was to maintain our estimated margins.
Field superintendents and crew foreman reported to me on progress and held regular meetings to ensure schedule and costs were being met. I was a daily contact between city and state officials to ensure project specifications were being met. I was also heavily involved with but not responsible for internal quality control, plant operations, trucking logistics. I successfully managed this project to 3% profit above margin and also was able to negotiate over $100k in change orders.
110k Tons HMA + Various amounts of pre-pave patching required
o    35k Tons SMA Placed with Shuttle Buggy system on Arterial Streets
o  50k Tons Grade S on Collector Streets
o    25k Tons Grade SX in Sub-Division Streets
Approx 700k SYs Milling
Manage all Subcontractors
o    Traffic Control
o    Traffic Loop systems
o    Traffic Camera systems
o    Striping (Temporary and Thermoplastic)
Prior projects I primarily was in charge of and held the same responsibilities as above include:
2006 City of Aurora Overlay Program $7.0 Million
2005 Douglas County Overlay Program $4.0 Million
2004 West Mineral Avenue Program $3.0 Million
2003 Greenwood Village Overlay Program $2.3 Million






A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.