BOBBY ROGERS 6726 E County Road 6200, Lubbock, TX 79403 cell: 806-778-8102 e-mail: txblood[at]aol.com
Energetic and motivating leader with proven ability to effectively manage both personnel and projects. Self-starter and strong independent worker. Excels at analyzing situations to efficiently generate expected results and production quality. Highly adaptable to ever changing circumstances. Key member in any team developing and executing strategic plans.
WORK EXPERIENCE
Granite Construction (1990 to present)
Finish Grade Foreman US 82 E/W Freeway Loop, Lubbock, Texas
Process and compact dirt for paving or finish grade (i.e. slopes and ditches). Supervise placement of drainage pipe and wall panels, drilling for soil nail placement, and set up line for main line and frontage road concrete placement. Oversee dirt placement for man-a-walk cranes to execute bridge beam placements and clean up after completion. Assist and oversee punch list completion on three of four phases. The 3A Project was listed as the tenth best project in Roads and Bridges magazine.
Utility Foreman Hwy 84, Littlefield, Texas
Responsible for new location set up. Reviewed applicants and decided on their crew assignments. Coordinated detour set up and sign placement. Supervised dirt work, structure set up, demo, and traffic control.
Set-up Foreman I-45, Ennis/Dallas, Texas
Supervised set up for the concrete lay down machine; set string line and hand forms for concrete placement. Supervised sub-contractors in the field responsible for rebar tie and saw cutting.
Utility Foreman Big Brown Railroad, Fairfield, Texas
Assisted in new location set up. Supervised labor crew on clearing dense tree filled terrain and burning debris, traffic and easement control, dewatering, waterproofing bridges and tressels, maintaining no dig zones, and all environmental issues throughout the project, including public relations with property owners. Headed a crew on a special community project which consisted of clearing debris, landscaping, and drive repair for a local cemetery.
Supplied support to other crews as needed to help meet their goals. Supervised a second pipe crew as well as other duties not assigned to a Task Foreman. Responsible for final move out at projects end, and returned with a crew to complete final punch list. Supervised one of only two crews who went the entire two-and-a-half year project without accidents or medical costs.
Laborer I-27, Lubbock, Texas
Progressed to responsibility for concrete sawing and single man demo, working on repairs to bridges and road tie-ins. Also operated a nine-tire Dyna pack on finish asphalt crew. Participated in the closing punch list on all phases. BOBBY ROGERS Page 2
EQUIPMENT EXPERIENCE
Loaders (938 and up)ForkliftDozer (push or rough grade)Track LoadersRubber Tire Back HoeHoe Rams (demo)Rollers (815-825)Track Hoe Maintainer (blade work)Sky TrackDyna Pack (rubber tire)Trencher Drilling Machine (Davy drill)Scrapers (615 and up) Most Hand-Held Tools (saw, jack hammer, drills)
CERTIFICATIONS
Forklift Astro Rentals Excavation Safety Training United Rentals CPR/First Aid American Red Cross
|