WILLIAM JAMES PRESLEIGH ResumeJune 23, 2009
EDUCATION Bachelor of Science Mechanical Engineering California State University, Chico - 1986
LICENSE General Building Contractor, State of California; License No. 775992 General Engineering Contractor, State of California; License No. 775992
ACTIVITIES Current Member - Board of Appeals, City of Redding Current Member - VIVA Downtown Redding Economic Restructuring Committee
PROFESSIONAL WORK HISTORY Covenant Construction Inc., 06-07 Project Manager/Superintendent - Anderson, CA Duties: On-site management of construction of commercial LEED project (Gaia Hotel)
Robert S. Bryant Construction Inc., '01 - '03 Project Manager/Estimator - Redding, CA Duties: In-office/on-site management of construction of commercial projects/prepare bids for same (Win-River Casino, Hotel Redding Remodel, Jamshid Saleh MD Office)
Robert W. Richelieu Architecture and Construction, '97 - '01 Project Superintendent/Estimator - Redding, CA Duties: On-site management of construction of commercial projects/prepare bids for same (Walgreens Pharmacy, Little Country Church Temple, Trinity Public Utilities District Complex)
De Spiegeleer Architects & Engineers, 95-97 Project Manager/Estimator - Phnom Penh, Cambodia Duties: In-office/on-site management of construction of commercial projects/prepare bids for same (Thakral Cambodia Industries Limited TV Factory, Monorom Hotel Remodel, Cambodia Ministry of Agriculture Office Building, Cambodia Power House #6)
Mascotech Inc., 94-95 Safety/Regulatory Compliance Engineer - Riverbank, CA Duties: Regulatory compliance for US Army Ammunition Plant/Superfund Site at Riverbank, CA (air, water, soils, safety)
- Can provide professional references. WILLIAM JAMES PRESLEIGH- ProjectsJune 23, 2009
Partial List of Projects (1995-2007)
Gaia Hotel Anderson Project Manager/Superintendent - $16,000,000 construction cost. Millville Veterinary Clinic General Contractor - $800,000 construction cost. Hotel Redding Remodel - Project Manager/Estimator-$4,400,000 construction cost. Win-River Casino - Assistant Project Manager-$21,000,000 construction cost. Trinity County Public Utilities District Complex - Project Superintendent-$2,700,000 construction cost. Little Country Church - Project Superintendent-$2,200,000 construction cost. Walgreens Pharmacy - Project Superintendent-$2,900,000 construction cost. Monorom Hotel Remodel Project Engineer-$4,720,000 construction cost. Thakral Cambodia Industries Limited TV Factory - Project Engineer/Manager-$8,000,000 construction cost. Cambodia Ministry of Agriculture Office Building - Project Engineer/Manager-$2,000,000 construction cost. Phnom Penh, Cambodia Power House #6 - Assistant Project Engineer-$15,000,000 construction cost.
Design Experience
Potchentong International Airport - Hydrology study/rainwater removal pump & piping configuration design existing & planned runways. Thakral Cambodia Industries Limited Hydrology study/rainwater removal & collection system design. NSED - Contaminated groundwater pump, piping & treatment configuration design/creosote pump & piping configuration design. NSED - GC based air pollutant source monitoring & sampling system.
Also worked in part-time capacity (e.g. project management, project superintendent, inspection, survey, layout, design) on the following and other projects:
Crystal Geyser Water Bottling Plant Weed, California Jamshid Saleh, MD Office Redding, California Shasta Orthopedics & Sports Medicine Office/Operating Theater Redding, California Rudy Balma Residence Redding, California Visiting Dignitary Residence Phnom Penh, Cambodia Sihanouk Hospital Phnom Penh, Cambodia Luxury Beach Residence Kamphong Som, Cambodia Asian Development Bank Office Remodel Phnom Penh, Cambodia Luxury Riverside Houses, Contemporary and Traditional Phnom Penh, Cambodia
|