Name : Craig Honn
Industry Type : Mechanical Contractors
City & State : Houston, tx
Job Title Materials/Logistics Mgr.
Relocation Preferences : none
Objective :


I am presently between job assignments. While I enjoy the construction "project" career, I would consider a permanent position. Over the past 20 years I have worked on major industrial construction project ranging from 18 days to 2 years in duration. These projects have included: new construction, capital improvement projects and maintance turn arounds. The projects that I have been involved in over the past years have a collective dollar amount in excess of 2 Billion Dollars. I have been responsible in part or whole for all the equipment, and materials used for construction and installation. My resume is attached, and I appreciate your consideration for a position.


Resume :  
CRAIG MARK HONN
Pasadena, Texas 77503



PROFESSIONAL EXPERIENCE
Lead Mechanic Jacobs Field Services NRD project, Feb 4, 2010 to Feb 26, 2010 Responsible for obtaining materials for the Hydro Crew and installion and testing of piping systems. As Lead man I was in line to fill in for Hydro foremen in the event of their absence.


Materials Expeditor Jacobs Field Services NSR Project, April 2009 to August 2009 Requisitioned checked confirmed and delivered material to field for erection
I managed the field request for materials needed in the field for Installation, thru computerized system, or written requisitions. I was responsible for cross referencing specs, to assure the right material was being requested by the field management.


Turn Around Coordinator CDI Engineering Corp July, 2008 to Nov. 2008 Responsible for coordinating activities of all logistics support groups for a Major Coker Turn Around lasting 122 days. This included the labor pool, Traffic Control, Bus Transportation Company, Fuel vendor, Major Equipment Rentals,and Facilities Manitance..

Material Manager .BE&K May 2006 to Nov 2006 Performance April 2007 to April 2008 Responsible for the activities of all operations of the material group, including temporary and permanent material, tools, consumables, and expendables Maintained records of purchase orders, material receiving reports, inventory on hand and pending deliveries of material. Provided the site manager with daily reports of material sent to the field and material pending status reports. Acted as liaison between the Instrument and Electrical contractor and Mechanical contractor, as well as between the client and project supervision regarding material status. I interfaced between vendors, client, and employees to assure smooth operation of all aspects of material flow. Prepared reports using both excel and word, and attended meetings with clients and contractor supervision

Materials Expeditor JV Industrial Companies Dec 2005 to May 2006 Requisitioned checked confirmed and delivered material to field for erection
I managed the field request for materials needed in the field for Installation, thru computerized system, or written requisitions. I was responsible for cross referencing specs, to assure the right material was being requested by the field management.

Warehouseman Aker Solutions Jan. 2004 to Nov 2005 Shipping and receiving, bag and tag, manage lay down yards, tool room coverage.
Duties included matching Purchasing orders to the packing slips, count and verify amount, and grade of materials received. Pulling material and issuing to field by Isometric drawing number, maintaining inventory of pipe spool, pipe supports, and various large bore fittings in the lay down yard, also the off loading of vendor trucks and the loading of company trucks for movement of materials to the field. Tool room coverage required daily record keeping of tools going to and coming from the field on each shift; as well as maintaining inventory of expendables and consumables.

Brown and Root Inc Oct 1990 to Oct 2003 Filled various positions, including the following:

Pipe Expeditor Requisitioned checked confirmed and delivered material to field for erection
Warehouseman Shipping and receiving, bag and tag, manage lay down yards, tool room coverage. matching Purchasing orders to the packing slips, count and verify amount, and grade of materials received. Pulling material and issuing to field by Isometric drawing number, maintaining inventory of pipe spool, pipe supports, and various large bore fittings in the lay down yard, also the off loading of vendor trucks and the loading of company trucks for movement of materials to the field. Tool room coverage required daily record keeping of tools going to and coming from the field on each shift; as well as maintaining inventory of expendables and consumables
Warehouse foreman Oversaw daily operations of warehouse, max-min trailers, lay down yards and employees. Responsibilities included time keeping for warehouse staff, cross referencing packing slips against purchase orders, maintaining record of receiving reports, dock reports, MTRs and maintain inventory stock reports, and Issue documentation.
Warehouse General Foreman Responsible for the activities of foremen, their employees and the tool rooms, warehouse, and lay down yards. I kept the material manager informed of my groups activities.
Material Control Coordinator did material take off from drawings and wrote requisitions for the purchase of material for Pipe, civil, structural iron, and Instrument departments. Responsibilities included the reading of isometric, orthographic, and P&ID, using spec books and calculating the footage, and amount of fittings, valves, hangers, supports, trim, and instruments needed for the completion of each project.
Purchasing Agent sent out requisitions for competitive bids and ordered material for new construction projects, based on lowest and best bids and availability of material. I was responsible for providing a complete material description all materials being offered for bid to the vendor. Interacted with project engineers as needed to insure substitution materials met or surpassed specification of the project

Prior to industrial construction, I worked in industrial chemical sales, and owned my own residential and commercial construction company.


EDUCATION
Graduate Newkirk High School Newkirk, Oklahoma
58 credit hours Northern Oklahoma College Tonkawa, Oklahoma

Certifications

N.C.C.E.R. Industrial Pipefitter V3 July 21,2009 (no expiration)

T.W.I.C. Card Expires December 12, 2014

Professional References for Craig Mark Honn


Kenneth Williams
Turn Around Construction Mgr.
LyondellBassell
Houston,Texas
713-769-4640

Donald Wilkins
Construction Supt,
JV Industrial Construction
Deer Park, Texas
281-785-8457


Bob Wilburs
Construction Planner
Fishbone Comanies
Pasadena, Texas
281-620-9015

Micheal Palmer
Site Manager
Performance Constructors Inc.
Deer Park, Texas
979-482-0839

Jason L. Thompson
Materials Manager
Jacobs Engineering
Houston, Texas
713-569-2681






A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.