Shayne N. Weight Page 1 of 4 Shayne N. Weight 1874 East Riverbottom Road Springville Utah 84663 (C) 801-707-2176 (H) 801-885-8895 clampitcoping[at]hotmail.com EMPLOYMENT OBJECTIVE To obtain a challenging manager or superintendent position involving all phases of the construction process in the industrial, heavy highway or mining sectors emphasizing in structural concrete. SKILLS Skill Name Leadership Supervision Concrete construction Large budget project completion Mining Water Treatment Facilities Heavy highway construction Verbal communications with trades, subs and clients Managing sub contractors Vast knowledge in most construction trades Confined space trained Certified steam generation power plant B&C operator 2 years Crane operation: 2000 hours Skill Level Expert Expert Expert Expert Expert Expert Expert Expert Expert Expert Expert Expert Expert Last Used/Experience Currently Used/25 years Currently Used/19 years Currently Used/30 years Currently Used/25 years Currently Used/19 years Currently Used/10 years Currently Used/6 years Currently Used/25 years Currently Used/30 years Currently Used/15 years Currently Used/30 years Currently Used/2 years Currently Used/20 years Shayne N. Weight Page 2 of 4 WORK EXPERIENCE Position Title August 1990 Present Ames Construction Salt Lake City, Utah Completed many multi-million dollar jobs Managed and scheduled subcontractors for projects Responsible for takeoffs, gathering estimates and purchasing project materials and equipment. Acted as field superintended for the Timpanogos Special Service District in American Fork Utah (8 MGD Waste Water Treatment Plant Upgrade) Superintendent at Kennecott Utah Copper tailings thickening and distribution project (won an award for my work ethic and contributions to the project) Superintendent for the SR 202 bridge construction for Kennecott Utah Copper. superintendent for the Kennecott Utah Copper Tailings Modernization project Acted as a Tank House Superintendent at the Kennecott Utah Copper Refinery Modernization. Worked at the Kennecott Copper Smelter Acted as a Project Superintendent for Kennecott Fourth line copper concentrator Project Won awards at Clarks Station Power Plant in Las Vegas, Nevada; for outstanding safety record Transferred overseas to Zererifshan, Uzbekistan crushing and screening plant for a heap leach gold mine Functioned as the Safety Supervisor at the Pegasus Gold Mine Project on the Utah/Idaho border Awarded Innovator of the 2007 Year for Ames construction for inventions that are now being patented for a MSE wall coping form system used on the UDOT Provo Canyon Reconstruction Project , ( Ames construction)Legacy highway,(Ames construction & WW Clyde construction) I-80 2100 South,(Ralph Wadsworth construction) I-15 Springville exit.(Wadsworth brothers construction) Structural superintendent for four UDOT projects, four wastewater plant projects, one fresh water plant, and two power plants Structural superintendent for many large mining projects at multiple mines in Northern Nevada Detailed Project History Superintendent (10/08 - 1/09) I-15 [at] 11400 South; Utah Department of Transportation; Salt Lake City, Utah Oversee the placement of temporary office and yard facilities Installed a temporary bridge for haul trucks Protection for box culverts Supervised two crews of three or more people per crew ** Superintendent (11/08 - 12/08) B&B Ranch project; McAllister, Montana Supervised a four-week project at Ames Private Ranch, to design and update ranch (and neighboring town) water head gates and diversions Work was recognized and admired by the city of Pony and Montana State Water Commissions. Supervised one crew of four men Shayne N. Weight Page 3 of 4 ** Superintendent (3/08 - 10/08) Air Liquid Oxygen Plant; Salt Lake City, Utah Supervised the construction of footings and foundations, ground and suspended concrete slabs, and concrete pads for liquid air manufacturing plant Supervised three crews of eight or more people per crew Managed subs ** Superintendent (08/08 - 11/08) Gordon Avenue Project; Layton and Farmington, Utah (Utah Department of Transportation project) Supervised a major widening and reconstruction project along the Interstate-15 corridor in the area Oversaw all phases of structural concrete (approximately 3-1/2 miles of cast-in-place barrier rail of various heights and type) Designed and built all forms used to complete the project Constructed and reconstructed approximately 200 catch basins Widened existing pre-cast girder bridge and various related structures Supervised four crews of six to twelve men per crew ** Superintendent (1/08 - 8/08) Legacy Highway Bypass Project; UDOT; North Salt Lake City, Utah Oversaw and coordinated a five-mile length of heavy highway construction; Involved in phases I and II of the overall highway construction project Constructed precast box culverts with cast-in-place headwalls, canals, and pipe crossing, Installed approximately 5000 linear feet of cast-in-place barrier walls, coping, moment slab and barrier rail atop MSE walls Installed cast-in-place barrier-box culverts and other various structures Constructed approximately 300 catch basins Designed all forms for coping and barrier atop MSE walls Supervised five crews of six to eight people per crew ** Superintendent (8/07 - 5/08) Mapleton/Springville Pipeline; Mapleton and Springville, Utah Coordinated and oversaw the construction of inlet and outlet structures, including valve vault structures Reinforced concrete pipe encasements at all road crossings Supervised two crews of four to six people per crew ** Superintendent (12/06 - 8/07) Provo Canyon Construction Project; Provo, Utah Installed various concrete structures, animal crossings, and over two miles of coping Designed all of the coping forms used during the project Installed over two miles of keystone block wall Installed step and radius footings, Constructed over 300 catch basins Awarded special recognition and a plaque for Innovator of the Year on this project Inventions generated Ames Construction six-figure profits where no profit was expected Bridge Superintendent and Management (10/04 - 11/06) Interstate 395 Projects; Carson City, Nevada Shayne N. Weight Page 4 of 4 Brought in to help solve a problem on the project that caused several months of delays Recognized and corrected problems in several areas where a severe loss was anticipated Constructed six cast-in-place box girder bridges Maintained all bridge false-work over and around the citys main artery of traffic and maintained traffic flow at all times ** Indicates work being completed on multiple projects simultaneously EDUCATION Graduated from Springville High School; Springville, Utah Completed a 40-hour Hazwoper, Waste Training and/or Handling course Completed a 200-hour Safety and Management Course Completed an 8-hour Noise Dosimetry Course Emergency Response and CPR-certified Educated and experienced in Power Plant Fundamentals Confined Space Certified Completed 80 hours of Business Construction Management Training and certifications Completed hundreds of hours of M. S. H. A. training Over 2000 hours of experience on 60- to 200-ton cranes AWARDS RECEIVED Innovator of the Year, 2008 Two-time Dick Ames Award (Ames Construction Project of the Year for overall accomplishments, safety, profit, schedule, etc.) Award of Excellence, Bechtel Engineering (KUC Refinery Tank House project, 1994) HOBBIES AND INTERESTS Camping with family and friends Traveling Game hunting Shooting ATVs Wild horse hunting Horse riding Working on our property
|