RESUME:
MASTER PLUMBER
MATERIAL CONTROL SPECIALIST
MICHAEL J DOYLE
22 ELMA AVENUE
BURLINGTON NJ
08016
EMAIL: mikedoy[at]aol.com
PHONE:609-694-6153
NJMPL#7827
PROFESSIONAL EXPERIENCE:
Kellogg Brown & Root INTERNATIONAL IRAQ Employee# 339809 4/2005 6/2009
Material Specialist 2/08 6/09 Supervisor Dennis Blacknall 713-422-9837 HR Yvette Lacy 713-422-9853 HR Ivana Kolovrat 713-422-9837
Responsibility of maintaining stock levels, inventory,maintaining government property, ordering, requisitions, reporting of OS&D etc. Trained in the use of MAXIMO, FEDLOG, QUICK BASE
Plumber 4/05 2/08
Responsibility in maintaining the plumbing system for Ablution Units, DFAC, Bathrooms in office buildings as per the Military SOP
Installation of PVC, CPVC, Fusion , Black Iron, Galvanized, Copper etc Plumbing fixtures- Water Heaters, Washers Dryers, Water Closets, Sinks , Showers, Urinals, Faucets, Drain and Water Lines etc.
Babbitt Heating AC & Mechanical 07/2002 - 4/2005
Supervisor---5 man crew Renovation Project MAGUIRE AFB BDLG # 5656 $350,000.00
Responsibility for lay out, Take Off, Ordering and Delivery of Material, Maintaining Man Hours Log for 10 Man Crew, installation of Material and Fixtures under the specifications supplied by the Air Force.
Installation of 3 Copper Chiller Lines, 6 Cast Iron Waste lines, 2 Gas Piping, Mulitiple size Copper Water Lines, Commercial size Boiler, Preheaters, Fixtures Water closets, Janitor sinks, Showers, Urinals, Lavatories, Faucets, Water Coolers, Floor and Roof Drains, Back Flow Preventers etc. continued
Babbitt Heating AC & Mechanical continued:
Dept Of HousingHUD 4 Story Assisted Living $650,000.00
Supervisor-----25 men
HVAC, Mechanical and Plumbing Systems
Duties and responsibilities include but not limited to Layout, Inspections, Ordering, Purchasing, Equipment, Maintain Man Hour sheet, Rough in, Finish, and Testing
Installation of 8 water Main, 8Sewer Main, Copper lines up to 4, Cast Iron Waste lines, Insulation, Supports, No Hub and Gasketed Pipe, Black Steel up to 2 , Ductwork supply, return , fresh air and ventilation
Installation of Water closets, Urinals, Lavorities, Bathtubs, Janitor sinks, Kitchen Sinks, Faucets, Baseboard heating, Commercial Water Heaters, Boilers, Air Handlers, AC Units, Condensers, Floor Drains, Rough plumbing under slab and above slab, backflow preventers, zone valevs, Thermostats etc
NOAH Institute Connecticut Plumbing Upgrade $250,000.00
Supervisor --- 5 man work crew
Separation of salt water and waste water drain lines installing a filtration unit to the sea
Maintaining time sheets, take off and layout, order and purchase of material, job prep, Close out job with client
Pve piping, Submersible pumps, Electrical, Conduit, underground Filtration unit, Floor drains, concrete, demolition, sub contractors, etc
National Guard Armory Chester PA Plumbing and HVAC upgrade $350,000.00
Supervisor---5 man crew
Replacement and addition of Plumbing and HVAC equipment in facility Continued
Installation of HVAC equipment, water piping, waste piping, gas piping, fixtures etc.
Copper, Steel, Cast Iron and PVC piping, Water closets, Lavorties, faucets, Urinals, Janitor sinks, Water Heater, Boiler, Insulation, Stalls, Handicapp Bars, Lockers, Tile floor, Hose bibs, Backflow preventers
VA Hospital, PA Surgery Room Installation $300,000.00
Supervisor--- 5 man crew
Installation of piping for new heater, air handler Units
Responsible for lay out, takeoff and ordering of material, keeping man hours, handing out daily task and keep with hospital schedule and budget
Installation of 4 copper Supply and Return for heat unit, install Black piping for steam lines, Insulation, Floor drains, Cast Iron piping, Duct work and renovation and demolition of old plumbing systems
UA LOCAL 322 PIPEFITTERS AND STEAMFITTERS $ 250,000.00
Foreman---5 man crew 4/1999 5/2002
Assisted Living Buildings
Responsible for Takeoff and Layout, Ordering of material, Time sheets, Rough in, Gas piping, installation of Fixtures
Installed PVC piping, up to 2 copper Water lines, 2 Gas piping, Water closets, Lavatories, Faucet, Kitchen sinks, Janitors sinks, Mop Sinks, Tubs, Showers, Kitchen equipment, hose bibs, back flow preventers, Water meters
Continued
M J DOYLE PLBG HTG & MECHANICAL
OWNER
1992-1998
Was involved in all aspects of the Plumbing Service
Installation and repair of Sewer and Water lines, Tubs, Showers, Faucets, Water Closets, Urinals,, Floor sinks, Floor Drains, Roof drains and Vents Mop Sinks, Service sinks, Bar sinks, Kitchen Equipment, Rough ins, Gas piping, Pvc , Cast iron , Galvanize,Lead, Copper, etc
Threading, Lead joints, Mechanical, Fusion, Soldering, Brazing
Education:
Burlington Township HS 1970 1974 Diploma
Westampton fire academy 1973 Diploma Night school
Burlington County VO Tech 1976 1978 Diploma Night school PLBG Apprentice
Licensed in NJ as a Master Plumber 1992 NJMPL#9827 Continuing education every 2 years in support of license requirement
Non essential
Volunteer Firemen 1973 2004 Fire chief !980 1984 Planning Board mem 1984 Basketball coach 1991 1994 Softball Coach 1984 - 2004
RESUME:
PLUMBING/MATERIALSPECIALIST
MICHAEL J DOYLE
22 ELMA AVENUE
BURLINGTON NJ
08016
EMAIL: mikedoy[at]aol.com
PHONE:609-694-6153
NJMPL#7827
PROFESSIONAL EXPERIENCE:
Kellogg Brown & Root INTERNATIONAL IRAQ Employee# 339809 4/2005 6/2009
Material Specialist 2/08 6/09
Responsibility of maintaining stock levels, inventory, government property, ordering, reporting of OS&D etc. Trained in the use of MAXIMO, FEDLOG, QUICK BASE
Plumber 4/05 2/08
Responsibility in maintaining the plumbing system for Ablution Units, DFAC, Bathrooms in office buildings as per the Military SOP
Installation of PVC, CPVC, Fusion , Black Iron, Galvanized, Copper etc Plumbing fixtures- Water Heaters, Washers Dryers, Water Closets, Sinks , Showers, Urinals, Faucets, Drain and Water Lines etc.
Babbitt Heating AC & Mechanical 07/2002 - 4/2005
Supervisor---5 man crew Renovation Project MAGUIRE AFB BDLG # 5656 $350,000.00
Responsibility for lay out, Take Off, Ordering and Delivery of Material, Maintaining Man Hours Log for 10 Man Crew, installation of Material and Fixtures under the specifications supplied by the Air Force.
Installation of 3 Copper Chiller Lines, 6 Cast Iron Waste lines, 2 Gas Piping, Mulitiple size Copper Water Lines, Commercial size Boiler, Preheaters, Fixtures Water closets, Janitor sinks, Showers, Urinals, Lavatories, Faucets, Water Coolers, Floor and Roof Drains, Back Flow Preventers etc. continued
Babbitt Heating AC & Mechanical continued:
Dept Of HousingHUD 4 Story Assisted Living $650,000.00
Supervisor-----25 men
HVAC, Mechanical and Plumbing Systems
Duties and responsibilities include but not limited to Layout, Inspections, Ordering, Purchasing, Equipment, Maintain Man Hour sheet, Rough in, Finish, and Testing
Installation of 8 water Main, 8Sewer Main, Copper lines up to 4, Cast Iron Waste lines, Insulation, Supports, No Hub and Gasketed Pipe, Black Steel up to 2 , Ductwork supply, return , fresh air and ventilation
Installation of Water closets, Urinals, Lavorities, Bathtubs, Janitor sinks, Kitchen Sinks, Faucets, Baseboard heating, Commercial Water Heaters, Boilers, Air Handlers, AC Units, Condensers, Floor Drains, Rough plumbing under slab and above slab, backflow preventers, zone valevs, Thermostats etc
NOAH Institute Connecticut Plumbing Upgrade $250,000.00
Supervisor --- 5 man work crew
Separation of salt water and waste water drain lines installing a filtration unit to the sea
Maintaining time sheets, take off and layout, order and purchase of material, job prep, Close out job with client
Pve piping, Submersible pumps, Electrical, Conduit, underground Filtration unit, Floor drains, concrete, demolition, sub contractors, etc
National Guard Armory Chester PA Plumbing and HVAC upgrade $350,000.00
Supervisor---5 man crew
Replacement and addition of Plumbing and HVAC equipment in facility Continued
Installation of HVAC equipment, water piping, waste piping, gas piping, fixtures etc.
Copper, Steel, Cast Iron and PVC piping, Water closets, Lavorties, faucets, Urinals, Janitor sinks, Water Heater, Boiler, Insulation, Stalls, Handicapp Bars, Lockers, Tile floor, Hose bibs, Backflow preventers
VA Hospital, PA Surgery Room Installation $300,000.00
Supervisor--- 5 man crew
Installation of piping for new heater, air handler Units
Responsible for lay out, takeoff and ordering of material, keeping man hours, handing out daily task and keep with hospital schedule and budget
Installation of 4 copper Supply and Return for heat unit, install Black piping for steam lines, Insulation, Floor drains, Cast Iron piping, Duct work and renovation and demolition of old plumbing systems
UA LOCAL 322 PIPEFITTERS AND STEAMFITTERS $ 250,000.00
Foreman---5 man crew 4/1999 5/2002
Assisted Living Buildings
Responsible for Takeoff and Layout, Ordering of material, Time sheets, Rough in, Gas piping, installation of Fixtures
Installed PVC piping, up to 2 copper Water lines, 2 Gas piping, Water closets, Lavatories, Faucet, Kitchen sinks, Janitors sinks, Mop Sinks, Tubs, Showers, Kitchen equipment, hose bibs, back flow preventers, Water meters
Continued
M J DOYLE PLBG HTG & MECHANICAL
OWNER
1992-1998
Was involved in all aspects of the Plumbing Service
Installation and repair of Sewer and Water lines, Tubs, Showers, Faucets, Water Closets, Urinals,, Floor sinks, Floor Drains, Roof drains and Vents Mop Sinks, Service sinks, Bar sinks, Kitchen Equipment, Rough ins, Gas piping, Pvc , Cast iron , Galvanize,Lead, Copper, etc
Threading, Lead joints, Mechanical, Fusion, Soldering, Brazing
Education:
Burlington Township HS 1970 1974 Diploma
Westampton fire academy 1973 Diploma Night school
Burlington County VO Tech 1976 1978 Diploma Night school PLBG Apprentice
Licensed in NJ as a Master Plumber 1992 NJMPL#9827 Continuing education every 2 years in support of license requirement
Non essential
Volunteer Firemen 1973 2004 Fire chief !980 1984 Planning Board mem 1984 Basketball coach 1991 1994 Softball Coach 1984 - 2004
|