Raymond L. Martinez 5522 Thyme Lane Baytown, TX 77521 (281) 691-3382 (cell) E-mail: Raymond.Martinezl[at]hotmail.com
OBJECTIVE
To obtain a position that allows me to display my talents and knowledge in planning & scheduling, coordinating and/or supervising. I am a growth-driven self-starter who approaches each new challenge with contagious enthusiasm. Focused on safety, quality and efficient operation.
EDUCATION
1996 Brownfield High School GED 1998 Lee College; Baytown, TX Various Piping and Computer Usage Classes 1999 On-site User training in SAP 2005 NCCER Pipefitter 2005 P3/ Primavera training 2007 P5/ Primavera continuous training 2008 P6/ Primavera continuous training
WORK EXPERIENCE Timec & Transfield Planner & Scheduler 2009-2010 Baytown, Tx Detailed schedule development duties include establishing the Work Breakdown Structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the E/P contractors will be required. Other duties may require input to project monthly progress reports and issuance of periodic schedule analysis reports. Additional duties include implementation and maintenance of construction 3 week schedules and subcontractor schedules. Solicits full input and commitment from all project discipline leads on the desired timing, duration and sequencing of their primary tasks; thereby compiles the fully integrated, baseline master schedule networks (all requested levels) using Primavera planning software. Uses primary contractor schedules to build and maintain the project integrated schedule. Manpower loads integrated schedule so that histograms and progress S Curves are generated. Continually identifies and reports scheduling inconsistencies and potential problems. Maintains full understanding and awareness within the PMT, of the activities and relationships which make up the Critical Path(s). Monitors and reports progress and forecasts key milestone dates, based on project performance history. Flags any contractors intention to re-baseline without the prior approval of Company. Advises the PMT of opportunities to improve schedule and/or minimize risk. Critiques progress and compares with invoices submitted by contractors. Verifies resources (planned vs. actual) and productivity. Progressive use of technology. Primavera 6 and Microsoft Word, Excel, Power Point etc. Attended continuing education classes to increase knowledge of planning, estimating, bidding, scheduling and project management. Additional classes consist of Primavera 6, boilermaker, pipefitting, blueprints and layout. Attended seminars and trade shows to monitor construction industry trends. Met with client to determine scope of project and analyze current systems and procedures. Maintained constant communication with project team manager to report progress, identify issues, and allocate resources. Managed multiple projects and successfully achieved milestones, ensuring projects complied with all cost and scope specifications. Prepares, develops, coordinates, and integrates all levels of plans and schedules. Integrates with and across technical disciplines to ensure resultant plans and schedules accurately and comprehensively define the actual engineering work content, relationships and durations. Translate customer requirements into an Integrated Master Schedule. Integrated Master Plans and Integrated Master Schedules for solicitation response. Key contributor to program organization, team coordination.
Shaw Global Constructors Planner & Scheduler 2009-2009 LaPorte, Tx Detailed schedule development duties include establishing the Work Breakdown Structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the E/P contractors will be required. Other duties may require input to project monthly progress reports and issuance of periodic schedule analysis reports. Additional duties include implementation and maintenance of construction 3 week schedules and subcontractor schedules. Solicits full input and commitment from all project discipline leads on the desired timing, duration and sequencing of their primary tasks; thereby compiles the fully integrated, baseline master schedule networks (all requested levels) using Primavera planning software. Uses primary contractor schedules to build and maintain the project integrated schedule. Manpower loads integrated schedule so that histograms and progress S Curves are generated. Continually identifies and reports scheduling inconsistencies and potential problems. Maintains full understanding and awareness within the PMT, of the activities and relationships which make up the Critical Path(s). Monitors and reports progress and forecasts key milestone dates, based on project performance history. Flags any contractors intention to re-baseline without the prior approval of Company. Advises the PMT of opportunities to improve schedule and/or minimize risk. Critiques progress and compares with invoices submitted by contractors. Verifies resources (planned vs. actual) and productivity. Uses information to discuss deficiencies with contractors and to estimate mechanical completion date. Additional duties include implementation and maintenance of construction 3 week schedules and subcontractor schedules. Solicits full input and commitment from all project discipline leads on the desired timing, duration and sequencing of their primary tasks; thereby compiles the fully integrated, baseline master schedule networks (all requested levels) using Primavera planning software.
Baker Concrete Construction 2008- 2009 Project Control Manager Houston (Surrounding Areas), Tx Active experience in project planning, scheduling, and resource management. Detailed understanding of schedule creation, development, maintenance, and resource loading applied to both large and small industrial projects. Reorganized the scheduling department and set up standardized layouts for schedule, charts, reports and progress narratives that produced continuity and uniformity. Initiated and established weekly updating procedures for all projects. Adjusted lengthy, detailed schedules to user-friendly formats that improved reporting data by utilizing Excel spreadsheets, sorted by team member and/or area of operation. Improved overall reporting progress by emphasizing where a task should be on any given date compared to the original baseline dates. Produced project plans that enabled grouping and sorting of project tasks by discipline of work, team member and systems to maximize flexibility and effectiveness of schedule. Proposed and helped initiate a training program for the Project Management Department with Project Management Institute Training courses. Improved the coding system for all project plans that facilitated sorting and grouping by craft, area, and discipline of work. Championed a team building atmosphere to facilitate internal departmental and individual ownership of the project plan by emphasizing teamwork and buy-ins that became partnerships to help achieve the customers objective. Resource loaded schedules with quantities that monitored the flow of work compared to baseline and actual progress. Effectively coordinate management of resources and budget through resource loaded schedules. Communicating and reporting the results and conclusions gained through schedule and resource tracking to senior management and/or client representatives. Achieving committed performance from equipment suppliers and internal company resources through expediting techniques, tenacity, and organization. Strong written and oral communication skills including public speaking, persuasive communication, mass communication, and sales techniques.
Zachry Construction DuPont (Project Control Manager) 2007-2008 Laporte, Tx Plan & schedule work for the insulation, instrumentation and electricians, scaffold, pipe and building maintenance departments. Worked on the Nexxus program to build schedules and (WMP) to receive work. Navigate and build force reports to plant specifications. Maintain weekly and monthly meetings, per to maintain man-hours to a feasible amount per job and people availability. Fluent in both English and Spanish, strong organization, written and verbal communications. Supervised the activities of other craft planners in my role as lead scheduler. Interface with project managers, contract managers, project engineers, department supervisors and material coordinators. Experienced in planning tools SAP, Excel, Access, Outlook, CMMIS, and Nexxus. Developed planned packages, SAP work orders, materials, manpower, and field walkthroughs, outside vendor interface, plan coordination. Tracked purchase orders and field execution of work. Will be able to develop construction schedules, working with various E/P contractors, for all disciplines, and establishing and maintaining the schedules utilizing Primavera. Detailed schedule development duties include establishing the Work Breakdown Structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the E/P contractors will be required. Other duties may require input to project monthly progress reports and issuance of periodic schedule analysis reports. Additional duties include implementation and maintenance of construction 3 week schedules and subcontractor schedules. Solicits full input and commitment from all project discipline leads on the desired timing, duration and sequencing of their primary tasks; thereby compiles the fully integrated, baseline master schedule networks (all requested levels) using Primavera planning software. Uses primary contractor schedules to build and maintain the project integrated schedule. Manpower loads integrated schedule so that histograms and progress S Curves are generated. Continually identifies and reports scheduling inconsistencies and potential problems. Maintains full understanding and awareness within the PMT, of the activities and relationships which make up the Critical Path(s). Monitors and reports progress and forecasts key milestone dates, based on project performance history. Advises the PMT of opportunities to improve schedule and/or minimize risk. Critiques progress and compares with invoices submitted by contractors. Verifies resources (planned vs. actual) and productivity. Uses information to discuss deficiencies with contractors and to estimate mechanical completion date. Monitors project float and uses float deterioration to notify PMT of potential problems. Has primary role in the management of change process. Works closely with cost estimating / cost control, to ensure fully integrated project control services to PMT. Serves as schedule representative in project reviews.
Zachry Construction Shell Refinery (Planner, Scheduler) 2006-2007 Deer Park, Tx Generate reports of schedules, critical path and resources. Have the capability to learn anything in quick manner. Attended management meetings to advise the client of the areas of concern and current status. . Store duties such as creating, changing or deleting material from warehouse. Utilization of the SAP to perform weekly reports. Focused on safety, quality and efficient operation. Maintenance background, strong organization, written and verbal communications. Multitasked able to prioritize and meet deadlines. Mechanical tool and ability to read and follow drawings and schematics. Fluent in both English and Spanish, strong organization, written and verbal communications. Responsible for training, monitoring and development of hourly employees. Focused on safety, quality, and efficient operation. Interface with project managers, contract managers, project engineers, department supervisors and material coordinators. Schedule development duties include establishing the Work Breakdown Structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the E/P contractors will be required. Other duties may require input to project monthly progress reports and issuance of periodic schedule analysis reports. Uses primary contractor schedules to build and maintain the project integrated schedule. Manpower loads integrated schedule so that histograms and progress S Curves are generated. Continually identifies and reports scheduling inconsistencies and potential problems. Maintains full understanding and awareness within the PMT, of the activities and relationships which make up the Critical Path(s). Monitors and reports progress and forecasts key milestone dates, based on project performance history. Flags any contractors intention to re-baseline without the prior approval of Company. Advises the PMT of opportunities to improve schedule and/or minimize risk. Critiques progress and compares with invoices submitted by contractors. Verifies resources (planned vs. actual) and productivity. Uses information to discuss deficiencies with contractors and to estimate mechanical completion date. Monitors project float and uses float deterioration to notify PMT of potential problems. Has primary role in the management of change process. Works closely with cost estimating / cost control, to ensure fully integrated project control services to PMT. Serves as schedule representative in project reviews.
Zachry Construction 2006-2006 -Rohm & Haas (Planner/Scheduler, Supervisor) LaPorte, Tx Creating and changing purchase orders. Goods and invoice receipt discrepancies. Getting with vendors about invoicing and payment of invoices. Store duties such as creating, changing or deleting material from warehouse. Utilization of the EZ Pay Clock program, 2004 Edition. Utilization of the SAP to perform weekly reports for open hours, schedule completion, and converting them to excel charts and graphs. Also supervising the maintenance crew over Rohm & Haas plant, in all aspects of the trades, including millwrights, scaffold, pipe, and welding department. Will be able to develop construction schedules, working with various E/P contractors, for all disciplines, and establishing and maintaining the schedules utilizing Primavera. Detailed schedule development duties include establishing the Work Breakdown Structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the E/P contractors will be required. Other duties may require input to project monthly progress reports and issuance of periodic schedule analysis reports. Additional duties include implementation and maintenance of construction 3 week schedules and subcontractor schedules. Solicits full input and commitment from all project discipline leads on the desired timing, duration and sequencing of their primary tasks; thereby compiles the fully integrated, baseline master schedule networks (all requested levels) using Primavera planning software.
Shaw Global Constructors -Oxyvinyl - (Planner/Scheduler) 2005-2006 Deer Park, Tx Installation of process piping, replacing valves, also assisting on many pump, compressor, and centrifuge repairs Maintenance & Shutdown planning. Purchasing for Pipe & Millwright departments. I was the Y2K Total Plan Outage Coordinator. In charge of planning, coordinating, and execution of outside contractors and internal maintenance crews before and during Total Plant Outage. I have been utilizing the various modules of SAP to perform estimating, scheduling, material management, cost reporting, preventive maintenance record keeping, etc. Also proficient with Microsoft office tools such as Word, Excel, Project and Power Point. Responsible for outside contractor safety performance through routing field audits of activities. Assisted in the notifications and qualification process for scheduled work. In planning role, utilized knowledge of fieldwork to verify safety requirements of work tasks, and built safety steps and notifications into daily work schedules.