MY RESUME
RICHARD B. BENSON RICHBENSON49[at]YAHOO.CO [480] 543-9969
PROJECT PLUMBING AND H.V.A.C.SUPERINTENDENT W/ 30 YEARS EXPERIENCE IN COMMERCIAL AND INDUSTRIAL FIELDS.
SKILLS: COMPUTER AND FIELD AutoCAD 2008 Certification LT AutoCAD MEP-CADMECH 3D T.S.I. NavisWorks Manager 2010 TRIMBLE MEP Microsoft OFFICE 2007 Proficient Project Installation Project Supervision Project Job Costing Project Submittals Project Schedules Project Design Project Estimating Project Cad Coordination
Work-History: 1/5/09 to present SOUTHLAND INDUSTRIES 1506 E. Joh Ave. Baltimore, M.D. 21227 [443] 451-7700 PROJECTS: Fort Belvoir Hospital U.S ARMY/NAVPAC Walter Reed Hospital U.S. ARMY/NAVPAC Pentagon Wedge 5 U.S.Military Defense Information Systems Agency FORT MEADE U.S.ARMY Washington Headquarter Services 21 Story Tower Duties: Lead QC Piping Coordinator reviews and edits 2-D Mechanical Piping and Plumbing Coordination Drawings for field installation. Checks drawings for proper dimensioning, text, scale, labeling, pipe sizes, elevations, visual plot styles, equipment and fixtures, connections, as per plans and Engineers specifications, procurement, project submittals, I.F.C. and C.I. logs, for Tenant Fit out and Core and Shell. Reviews Engineers mark up drawings. Makes corrections in the CAD model file and plots in a P.D.F. form. Conducts a collision test with NavisWorks Manager 2010 and creates a NavisWorks Document thus exposing collisions with other M.E.P. trades and building structural. Submits a final spool drawing for fabrication to the Fabrication shop. Attends weekly coordination meetings with General Contractor, Project Manager, and Owners Representative, Engineers team, Architecture.
WORK-HISTORY: 8/08/08 to 12/05/08
RK MECHANICAL CONTRACTORS-GRUS PERSONAL 9300 Smith Rd, Denver, CO 80207 [303] 355-9696 PROJECT: South Metro Medical Campus Ambulatory Surgery Center GH PHIPPS BUILDERS PARKER, CO.
DUTIES: Project Superintendent has to become acclimated With the Scope OF Work, Procurement, Submittals, Project Schedules, Specifications and Project Coordination. This project is a design build which involves daily AutoCad 2-D detailed drawings for various coordinated installations of plumbing sanitary waste and venting, plumbing fixture cut sheets [for proper carrier elevations, stub-outs] owner provided equipment and other contractor provided equipment and fixtures. Proof reads 3-D cad spool drawings and coordination drawings for installation. Systems consist of sanitary waste and vent, domestic potable water hot and cold lines, house steam piping for sterilizers Washer/disinfectors and steam condensate cool down tanks. Medical gas piping systems and various medical gas components. Hydronic piping systems and sheet metal duct work. Daily supervision of production and quality control As well as company policy safety program. Monitors and enters input data for job costing, Payroll, proposal requests, R.F.I., field change orders And inventory.
WORK-HISTORY 2-06-07 TO 2-21-08 AERO-TEK ENGINEERING/ RONCO MECHANICAL 11160 DEER PATH WAY HANOVER, MD. NATIONAL HARBOR PROJECT OXEN HILL, MD. POTOMAC PROMENADE TOWERS CLARK CONSTRUCTION COMPANY
DUTIES: Design Project Superintendent on a 21-story concrete Poured in place/pile cap/grade beam/post-tension Structural type complex. This project consisted of two Sub-parking levels with a sanitary waste and vent system For the parking area floor drains. This below invert required A 1500 gallon concrete pre-cast oil and sand interceptor And a duplex sewage ejector pumps system. The storm Drainage u.g. system as well. The ground floor consisted of A Tenant Improvement area. We designed grease sanitary System with 2-1500 concrete pre-cast grease interceptors For future tenant expansion for culinary use. The towers consisted Of 7-different floor plans of condos in which we installed a SO-VENT Sanitary waste and vent system for the disposal of waste. The Domestic Potable water system consisted of boosted water mains provided by The Armstrong dual booster pumps and a hydrocumalator tank. The hydronic condenser water heating system mains consisted Of 3-heating boilers located on the penthouse level along with the 2-cell cooling towers, condenser pumps and heat-exchanger. Domestic hot water boilers, recruit. Pumps and storage Tank also located on the penthouse level. Pro-Set fire Rated sleeves where used along with the 2-d AutoCAD coordinated Sleeves drawings for each floor. Each drawing had a pre-determined Control line in place for precision placement of the pipe sleeve. Daily supervision and accounting of all activities.
Work-History 2/03/03 TO 11/25/06
COMFORT SYSTEMS U.S.A. MECHANICAL CONTRACTORS Houston, TX.
WASHINGTON D.C.PROJECT 12- Story Tower Duties: Project Superintendent on a Tenant Improvement. Design built project consisted of a new sanitary waste and vent System, domestic potable water system with new booster pumps, Revised natural gas piping system, new heating boilers and new Plumbing fixtures. Daily supervision of production and enter Data for project accounting. DENVER, CO PROJECT High School Hydronic upgrade. Duties: Project Superintendent on a retrofit design type Project consisted of replacing existing hydronic heating Supply and return mains with a upgraded pipe size and New heating boilers. The scope of work required a new Sheet metal duct system for the new air handling units as well as installation of new v.a.v. air distribution boxes. Daily supervision and accounting of the project. Created 2-d AutoCAD as-built drawings for owners Operations manuals. SAN DIEGO PROJECT SCIRPPS MERCY HOSPITAL EXPANSION Duties: Project Superintendent on a new Angiography Add on to existing building. The scope of work required a New medical gas piping system and tie into existing medical Gas manifolds. Master alarm panels and low pressure alarms Where also installed. Daily supervision and accounting. FARMINGTON NEW MEXICO PROJECT SAN JUAN FEDERAL CORRECTIONAL FACILITY Duties: Project Superintendent on a design built Male and Female inmate facility. This complex Has the capacity to house up to 2000 inmates In separate minimum and maximum securities. We designed a fully automatic Acorn shower System in the male/female minimum security Buildings, which is operated by one central Control room. The Culinary building with its State of the art kitchen equipment has the Capability to produce 3000 meals a day. This required a large grease interceptor. In which we designed a poured in place concrete 30,000 gallon grease retention capacity. Daily supervision and of course kept accounting Of all the daily activities. LAKE NORDEN PROJECT SOUTH DAKOTA DAVISCO FOOD PROCESSING PLANT Duties: Project Superintendent on a pre-cast concrete structural Type complex. This project involved approval of all cores thru slab walls, Ceilings and floors for pipe penetrations and shift openings for duct work. The underground sanitary waste and vent system consisted Of an acid resistant pipe and fittings. G.S.R. products polypropylene Was used with the bar coded fusion process machine. Flume Stations where installed in place to monitor the plants effluent. Daily supervision and accounting of all activities.
WORK-HISTORY 1-20-92 TO 1-15-03
LARRY HUDSON PLUMBING COMPANY Pinetop, AZ.
Duties: Plumbing Foreman on several schools and custom homes.
MADERA MECHANICAL 1-20-89 TO 12-15-91 Tucson, AZ.
Duties: Plumbing foreman on a replacement high school.
Professional References
Mr. Joe Gavin Washington D.C. Sanitation Commission Plumbing Inspector [301] 206-7306 ext. 6
K.N.I. Engineering-Mr. John Largen [301] 602-4257
Mr. Chris Storgen - Comfort Systems U.S.A. Project Manager [703] 928-4008
RK Mechanical Mr. Brian Skinner-Field Superintendent [303] 355-9696
|