From:
Sunil Kumar Singh Po. Box 673 (Sharjah) E-mail SK432003[at]yahoo.com Mobile No: 971 050 6965721
To, H R Manager
Sir/Madam,
Sub: Application for the post of survey Engineer
With due respect I would like to offer my services for the post of Survey Engineer or any other position which you deemed to fit, in your Esteemed Organization. As I have necessary qualification and about 13 years of Field Experience in the field of roads and bridge works in various Establishments and Contractors who are in Infrastructure/Highways/Bridges. Presently I am working with consultant in Halcrow International partnership a Sharjah D.P.W Highways & Bridges project. I am ready to work in any where in U.A.E . So I request you to kindly consider my application for the above said post. I hope I will get the positive response as soon as possible, as I can join at the earliest.
Thanking you
Yours faithfully,
(SUNIL KUMAR SINGH)
CURRICULAM VITAE
1. Name : Sunil Kumar Singh 2. Profession/Present Designation: Surveyor engineer
3. Date of Birth: 20-03-1975
4. Permanent Address : Purzon Digion Kariyana Palya Hennur Main Road Behind Speech & Hearing Institute Banagalore-84 Ph: 080-25466288 E-mail SK432003[at]yahoo.com
5. Years of Experience: 14 + yearsNationality: Indian
6. Area of Specialization: Highways /Bridges / Infrastructure Engineering
7. Position applied for: Survey Engineer.
8. Key Qualifications: Qualified survey Engineer having exposure to Construction Supervision and Construction management including quantity survey for the construction of major Roads/bridges and associated works. Have an overall experience of over 13 years, I the field of topography survey, Mining survey, with the use of latest survey equipments like Total Station , digital leveling , Auto leveling , in all over U.A.E, in all aspects of civil infrastructure and highways/bridges projects both with reputed contractors. This broadly encompasses construction, monitoring, and coordinating with clients, consultants, sub contractors and, site reconnaissance, surveying. My experience includes use of latest software like programming in Excel .Auto cad 2007i, Etc.
9. Education:
Diploma:Diploma Civil
Specialization:Civil Engineering
Year of passing:1995
College/University:AL-Khateeb Polytechnic Bangalore Technical Board of Karnataka
Visa status:Transferable Projects Handled
Year : APRIL 2007 TO Till NOW
1. Project Name King abadul aziz road pakage-5 AL WAHDA ROAD IMPROVEMENT (SHARJAH)
Type of project : (i) Length 1.6 k.m fly over deck slab with 37pier & Abutment in Al wahda road (2) Length 280.mt bridge deck slab with 6pier and Abutment in flying saucer (3) Length 565.010.mt Underpass in ABU SAGARA JUNCTION (4) Length 686.300 mt Underpass in CULTURAL SQURE
Employer: Halcrow International Partnership, U.A.E
Position Held : Survey engineer (supervision work) Exact Duties : Bridges Work Office work (checking of shop drawing which is given below)
(i) setting out co-ordinate of pile centre & offset co-ordinate of pile (2) checking of pile cutoff level, toe level and steel top level of pile (3) checking the setting out co-ordinate & level for formation, blinding , sand cement screed and pilecap bottom and top
Projects Handled
Year: February 2006 to march 2007
1. Project Name: King Faisal square interchange (Sharjah)
Employer: Halcrow International Partnership, U.A.E
Position Held : Surveyor, (supervision work)
Projects Handled
Year: April 2004 to January 2006
1. Project Name: Al-Nahadha Link Road to Junction 8E,Ring road (Sharjah Dubai border)
Employer: Halcrow International Partnership, U.A.E. Position Held : Surveyor, (supervision work)
Exact Duties (i) Road Works : Taking the natural ground level of site, prepare the formation level /Sub base level /Wet mix level & Road base level /Asphalt base level /Wearing course level /Kerb stone level as per given centre line profile level
Prepare the centre line co-ordinate of road /co-ordinate of Kerb stone/co-ordinate of soil wall $ retaining wall
Pavement level control in Reinforced roads constructed using sensor pavers with highest quality standards of finishing and concrete laying etc.
(ii) Bridges Work:-Layout and level calculation of minor & major bridges fly-over/ Pile foundation/ Header beam/Bearing layout, Deck slab bottom & top / Web & Tendon layout, Soil wall, Coping beam, P -2 parapet etc
(iii) Drainage Work: - Storm water drain includes open RCC drains of width 300mm to 4.6m on tubular steel piles at the center median and on either sides of road connected by box culverts. Construction of Berm drains along the hills.
Layout and level fixing of surface water Gullies /surface drainage manhole/foul drainage manhole/Etislat manhole/gas chamber/water valve chamber/JRC chamber etc
Landscaping: - All the unpaved shoulders, islands and center median were Landscape Biohydro seeding with cow grass cow grass.
2. From NOVEMBER- 2002 to April 2004
Employer:UE. Development India Private Limited Berhad Malaysia.
Project Name:Highway Project (UEM-ESSAR JV) NH-4 Sira to Chitradurga, Karnataka
Position held:Senior survey Engineer
Consultants: Louis Berger International Inc
Client: National Highways Authorities of India (MORT&H) (Cost of Project 250 Crores)
3. Year : JUNE 2000-OCT 2002
Project Name: JAPANIS BANK OF INTERNATINALCORPORATION (J B I C) Four lane to six lane of NH-5 of Jagat Pur to Chandichol section in Orissa (about 33.00 km). Cost of the project Rs-115.000 Crores Location : Orissa.
Employer : M/S KMC Construction ltd Andhra Pradesh
Consultants: SMEC INDIA PTY LTD
Position Held: Surveyor
Exact Duties : Work involves development of Widening and strengthening of National highways including dual carriageways with Four to six lanes, drainage work. Involved in taking OGL with total station, lay out of Major& Minor Bridges, Marking of project center line, marking the string level of Kerb & WMM,GSB bed, layout of well foundation & checking with consultant.
4. Year: March1998 to June 2000
Employer : M/s Apil Amil JV
Consultants: Freeman fox &Stup India Pvt Ltd.
Position Held: Surveyor
Exact Duties: (i) Taking the OGL, prepare the WMM, GSB, Sub grade & Embankment layer.
(ii)Road Works: - Pavement level control in Reinforced roads constructed using sensor paver with highest quality standards of finishing and concrete laying etc. Bridge Work: Layout of minor bridges &flyover, retaining wall, pile foundation etc
Drainage Work: - Storm water drain includes open RCC drains of width 300mm to 4.6m on tubular steel piles at the center median and on either sides of road connected by box culverts. Construction of Berm drains along the hills. 5. Year: Aug1997 to March 1998
Project Name: Haldiya Petrochemical ltd Haldiya, West Bengal
Location : West Bengal
Employer : M/s Toyo Engineering Japan
Consultants: Haldiya Petrochemical ltd
Position Held: Surveyor Exact Duties: Layout of major foundation, vertical checking of vessel, Column, level control of equipment foundation.
Year: 1995 April to JULY-1997
6. Project Name :Pipeline Project
a. Enron / Metgass Dabol-Hazira natural Gass Pipe line ,480km Gass Authoriyt of India (GAIL) b.LPG Pipeline From Hassan to Coimbatore (340km) c.Reliance (LPG) Pipeline Survey from Goa TO Hydrabad Employer:Secon Surveys P.V.T. Ltd., Bangalore
Salary Drawn:
Expected Salary :
Date: : 09-07-09
Place : Sharjah (Sunil Kumar Singh)
|