NAZARIO H. HABLA Blk 18 Lot 17 Garden Village Sta. Maria Bulacan Mobile No.: (0921) 5739288
OBJECTIVE A career in a company as a CRANE OPERATOR / HEAVY EQUIPMENT OPERATOR / DRIVER
QUALIFICATION SUMMARY
740 Articulate Dump TruckGrove RT 760Grove AT 750 BE Swingaway CAT Roller CS563Pedestal -55 TonGrove RT 755 Bulldozer D9N CATLiebherr LTMGrove RT 745 Bulldozer Komatsu: DZ141060 PedestalGrove RT 740 Wheel Loader CAT:966 CP&H T750 Pedestal Backoe CAT:Z45B Series 11Grove Truck Mounted - Model 995120 Ton Grove Truck Mounted -Model 880, 80 Ton WORK EXPERIENCE
Date:September 13, 2006 December 25, 2008
Position:HEAVY EQUIPMENT OPERATOR
Equipment Operated:Dump Truck 740 Caterpillar Caterpillar Roller CS563 Dump truck D400 Caterpillar
Name of Company # 1:Atlantic, Gulf & Pacific Company of Manila Inc. Unit 818 8th Flr. AIC Burgundy Empire Tower ADB avenue corner Garnet St., Ortigas Center Pasig City, Philippines
Project Assigned:AG&P GORO NICKEL PROJECT New Caledonia 85 Avenue deu General de Gaulle-Immueble Carcopino 3000 98800 NOUMEA
Project Profile: Goro Nickel S.A., a joint venture of Inco Ltd. Of Canada and BRGM of France, plan to build an open-pit mine, a processing plant and a deep-sea port to recover nickel and cobalt from laterite ore deposits in the Province Sud of the Island of New Caledonia in the South Pacific
Area Designed: Earth Moving DAM ______________ Date:January 7, 2001 October 15, 2004 Position:CRANE OPERATOR Equipment Operated:Liebherr LTM Truck Mounted Model 1060 , 60Ton Name of Company # 2:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:Lummus Alireza Ltd., Saudi Aramco Upgrade Project Abu Safah Oilfield, Kingdom of Saudi Arabia ______________ Date:July 4, 1999 November 9, 2000 Position:CRANE OPERATOR Equipment Operated:Grove RT Model 760 , 55 Tons Name of Company :Mohammad Al- Mojil Group Saudi Arabia Project Assigned:EO / EG Kemmia Olefin Expansion Project Jubail Saudi Arabia ______________ Date:May 12, 1998 to June 10, 1999 Position:CRANE OPERATOR Equipment Operated:Grove Truck Mounted Model 995, 120 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:EG / EO Yanpet Expansion Project Yanpet/ Flour Daniel/ Toyo Project Yanbu Saudi Arabia ______________ Date:March 2, 1997 to April 17, 1998 Position:CRANE OPERATOR Equipment Operated:Grove Truck Mounted Model 880, 80 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Shyba Pipeline - Aramco Project Rahima rastanura , K.S.A.
______________ Date:January 12, 1996 to February 18, 1997 Position:CRANE OPERATOR Equipment Operated:Grove AT Truck Mounted Model 750 BE, 45 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Ar- Razi 2 & 3 Project Saudi Methanol Company (Ar- Razi) Jubail, K.S.A. ______________ Date:November 3, 1995 to December 22, 1996 Position:CRANE OPERATOR Equipment Operated:Grove RT Model 755, 50 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Saddaf Expansion Project Electro Mechanical Construction Jubail, K.S.A. ______________ Date:September 15, 1994 October 23, 1995 Position:CRANE OPERATOR Equipment Operated:P&H truck Mounted Model 750, 50 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Polyster Project Bechthel Project Yanbu, K.S.A. ______________ Date:July 8, 1993 August 20, 1994 Position:CRANE OPERATOR Equipment Operated:Liebherr RT Model 1050, 50 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Hawtha Project Lummus Project Riyadh, K.S.A. ______________ Date:May 6, 1992 to June 13, 1993 Position:CRANE OPERATOR Equipment Operated:Grove RT Model 745, 40 Tons Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Catalyst Project Riyadh, K.S.A. ______________ Date:March 16, 1991 to April 20, 1992 Position:CRANE OPERATOR Equipment Operated:Wheel Loader CAT Model 966C Bachoe CAT Model Z45B Series II Bulldozer Komatzu Model DZ14 Name of Company:Mohammad Al- Mojil Group Saudi Arabia Project Assigned:MMG: Binhayan Project Saudi Plastic Company Jubail, K.S.A.
DUTIES AND RESPONSIBILITIES
In Kingdom of Saudi Arabia I was hired by Mohammad Al-Mojil Group as Crane Operator, Heavy Equipment Operator and Driver assigned in various projects such as Catalyst Project, Hawtha Project in Riyadh, Kemmia Olefin project in Jubail, Polyster Project of Bechthel in Yanbu., Armaco Pipeline in Rahima Rastanura, Saudi Aramco Upgrade Project Abu Safah Oilfield.
-Had been contract to different companies and projects under the label of Mohammad Al Mojil Group of Saudi Arabia. - Working as Crane Operator in the construction of Ethylene Glycol and Ethyline Oxide and Kemmia Olefin Expansion Project. - Rigging and installation from light to heavy lift - Provide check and maintenance to crane equipment assigned to my responsibility - Perform repair and troubleshooting of simple malfunction of crane equipment - Knowledgeable of rigging procedure and rigging signal - Conduct training and lectures of personnel on different kinds of heavy equipment such as caterpillar, backhoe, mobile crane, lever & groove (telescopic crane), pay loader and bulldozer. - Prepare report of activities regarding the operation accomplished. ______________ Date:April 19, 1982 to December 18, 1983 Position:HEAVY EQUIPMENT OPERATOR Equipment Operated:Payloader, Bulldozer, Backhoe and Crane Name of Company # 3:Heilit and Woerner Bau Ag IRAQ
Operate pay loader Caterpillar Model 950, 2 cubic meter capacity for loading materials for dump truck for backfilling and leveling our site area. Then load gravel and sand or filled up the say low in batching plant and prepare for the operator. And also operate Caterpillar Bulldozer D-8 for stock filling, pushing stock filling materials. Also assigned to operate 225 Caterpillar Backhoe for excavation or water line, drainage, pipe laying and water ground installation.
Sometimes operate grove crane 18 to 50 tons capacity on lifting different housing and road construction areas, lifting pipes of various length and diameter in pipe laying. Also include lifting of construction materials such as steel beams pre-cast gardens, concrete slabs and other-fabs for installation.
In the afternoon after work the equipment must filled up of crude oil before it garage in the morning after leaving and going to the operation, check the engine oil, water in radiator, battery and also in water air, tires, brakes, transmission oil, lamp side mirror and horns and fill-up or replace if necessary. Also check the lubricating system, greasing all fitting for every three days so that the machine will last longer and serve the company as so many years.
______________ Date:Sepetember 1978 October 1981 Position:HEAVY EQUIPMENT OPERATOR Equipment Operated:Payloader, Bulldozer, Backhoe Name of Company # 4:C.B. Picpican Construction Philippines
Operate 225 Caterpillar backhoe for excavation of water line, drainage, pipe laying and water around installation. Sometimes operate caterpillar bulldozer D-8 for Stock Filling, pushing stock materials and operate pay loader 2 cubic meter capacity for loading materials for dump truck for back filling and leveling out site area.
In the afternoon or after work the equipment must filled-up of crude oil before it garage, and before leaving and going to the operations, check the engine oil, water in radiator, battery and also in water, iar filter, tires, brakes, transmission oil, lamps, side mirror and horns and fill up or replace if necessary. Also check the lubricating system, greasing all fitting for every three days so that the machine will last longer and serve the company as so many years.
PERSONAL INFORMATION
Date of Birth : May 6, 1950 Place of Birth : Trece Martirez, Casiguran Sorsogon Nationality : Filipino Civil Status: Married Name of Child: Jane Kristine D. Habla Religion: Iglesia ni Kristo Height: 5 feet and 7 inches Weight: 130 lbs. S.S.S. Number: 03-1908270-6 T.I.N.: 177-316-450 NBI No.: H836N5BLAI00000
In case of emergency contact: Jane Kristine D. Habla Blk 18 Lot 17 Garden Village Sta. Maria Bulacan
EDUCATIONAL BACKGROUND
Secondary: 1962 1966 Donsol High School
Primary: 1956 1962 Trece Martirez High School
CHARACTER REFERENCES
MR. FLORANTE JOVEN VILLAFLOR MR. EDMON V. SANTOS Administrative SupervisorEngineering Manager AG&P AG&P GORO NICKEL PROJECTEO / OG Yanpet Expansion Project MMG, Yanbu Kingdom of Saudi Arabia
MR. E.D. McKeithanMR. EMITERIO ROSETE, JR. EO /EG Yanpet Expansion ProjectNarabian Co. Ltd. Contracting Office MMg, Yanbu, Kingdom of Saudi ArabiaAramco Yanbu , Kingdom of Saudi Arabia
MR. ALFRED D. GREINERMR. STEVE FORKINGS Project ManagerConstruction Supervisor Bugshan Stone & Webster Co. LtdLummus Alireza Ltd. Co. And Handling facility ProjectSaudi Aramco P.M.T.
|