SUMMARY Seeking a challenging position that allows me to apply my construction expertise along with organizational and project management abilities. I am a dependable professional with a demonstrated ability to manage, motivate and build cohesive teams that achieve results. Excel in managing projects with strong detail in problem solving and follow through capabilities.
EXPERIENCE* 25 yrs Bridge Building Experience (Last 15 yrs as a General Superintendent) * Strong management abilities * Interpret Highway Construction Blueprints * Surveying Knowledge * Computer Literate * Equipment Operator, Conventional Cranes, Hydraulic Cranes, Dozer, Backhoe, Excavator
EMPLOYMENT Austin Bridge and Road, L.P. Irving, TX 5-03/8-09 General Superintendent Manage projects ranging from $1 Million up to $40 Million Managed multiple projects at a time Maintain working relationships with Sub-contractors and State Inspectors Performed cost projections, equipment projections Assisted in Scheduling of projects Versatile in use of computer systems for project documentation Ordering of materials Surveying
L.A. Sears Construction, Inc., McKinney, TX 10-92/5-03 General Superintendent Manage projects ranging from $50,000 to $1.6 Mil. Maintain working relationships with Sub-contractors and State Inspectors Assisted in estimating operations Utilize computer skills for planning, scheduling all phases of projects Ordering of materials Hiring of employees Performed surveying duties, including, but not limited to, initial project layout
Austin Bridge and Road, L.P., Irving, TX 2-92/10-92 Structures Lead Man Assisted in construction of cofferdams, footings and columns
Traylor Brothers, Beaumont, TX4/91-2/92 Started as carpenter , Promoted to Hourly Foreman Built caps, columns and slabs Williams Brothers, Beaumont, TX10/89-4/91 Started as Crane Operator, Promoted to Foreman As foreman drove concrete pile and built bridge substructures As crane operator built bridge substructures
Austin Bridge and Road, L.P.
8/83-9/89 Started as Laborer, Promoted to Lead man Worked in all phases of bridge construction Pile driving, Footings, Columns, Caps, Slabs, Rail, and Approach Slabs Built Rail Road Bridges
EDUCATION
Texarkana CollegeFall-07/ Fall-08 Basics
Computer Learning Center, Hurst, TX11-99/01-2001 Network Engineering and Management Graduated with honors
|