SENIOR MECHANICAL CONSTRUCTION SUPERINTENDENT
Objective:
A visionary project / pipeline construction manager specializing in power generation and oil, gas and petroleum refinery mechanical Engineering. Led large, time-critical projects from inception through successful installation and implementation. Strategic planner with comprehensive management, organizational development, and project execution.
Qualifications:
Proficient in PFDS, P&IDs process flow, sizing of pressure vessels, pumps, flow in corrosion interpretation of regulations, codes industry standards relates to oil, gas NACE (RP0104, RP0169 and RP0193) Specialist in welding applications of STICK, TIG, MIG and Sub ARC. Welding 100% X-ray and Welding inspector Non Destructive Specializing in Methane gas pipeline installation, and maintenance. Supervised Structural Construction Underground pipeline installation, QC of pipeline joints, and welds. Monitored pipeline progress, scheduling and deadline completions Manage construction and retrofit from 150 mw to 800 mw Boilers, Steam lines, Cooling Towers, Pumps and Motors Reading and Analyzing Blueprints and Piping Layouts Supervision of 20-man Pipe crew including Welders Extensive Overseas experience, as Supervisor in Foreign Countries Conceive Pipeline vision. Develop the plan. Implement all details Motivate and lead all levels to operate toward the organizations goals D.O.D. National Security Clearance
Experience:
MITSUBISHI /POWER SYSTEM, VICTORIA TEXAS 2007- 2008
Senior Mechanical gas piping Technical Advisor
Worked as a Senior Technical Mechanical Advisor for Mitsubishi Power Plant System, at Victoria Texas My duties consisted: Making sure that all piping system and codes were per Mitsubishi drawings and engineering specifications. Work hand in hand with mechanical subcontractors at the Victoria Nucostal Power Plant. Modular CFB (GAS FLUID BOILER).
Installation M-501-Series F gas turbine Duties included: Piping in air and fuel Gas system, Lube Oil System, Control Oil System, GT Blade Washing Water System, and Fuel Gas System, GT instrument Air System, Cooling Water System, N2 Gas System, and Pure Water System.
1- Fluid bed furnace 2- Air heater 3- Steam drums 4- Air inlet. 5- Fuel gas outlet 6- In bed evaporator tube bundle 7- Economizer 8- Air heater outlet 9- Primary super heater 10-Air heater inlet 11-Waterwalled
PB/ICM Council Bluffs, Iowa 2006 -2007
Senior Mechanical Superintendent
Managed the construction of piping and vessels at an ethanol plant.
Managed 4 Sub-Contractors which totaled 200 man power on a daily basis. Total costs for ethanol plant will be $140 million. Over saw the mechanical aspect of the construction of the ethanol plant. Responsible for over seeing engineering drawings, developing specifications, evaluating the scope of work, and assigning project tasks. Also managed project performance standards, developed cost-effective solutions, oversaw installation, QC, and scheduling of pipeline production.
Resource Technology - Chicago, Illinois 1994 -2006
Construction/ Maintenance Manager
Job Value/ $40 to $80 Millions, per contract.
Duties as a landfill gas collection system construction, supervised 30 to 35 landfills, in Illinois and other States of the mid west. These projects consisted of piping and excavation of various sides. Video inspection for the purpose of Methane Gas to Energy to determine corrosion of existing pipeline. Installations of four to eight gas solar turbines depending on the side of the job in question .
These were located throughout the US with individual project assets totaling $30 million dollars.. Managed project performance standards and integrity, identified above and underground pipeline discrepancies, developed cost-effective solutions, and supervised maintenance, also extraction of toxic waste water removal and repair of methane pipelines. Collection system construction expert designated to visit sites and make recommendations.
Clark Boiler Engineering Lakeland, Florida 1990-1994 Boiler Mechanic Supervisor
Maintenance and repair of combustion engineering, Water wall, Fire tube Boilers and installations. Managed and trained a support of 25 employees. Boilers makers with experience in re-tubing and rolling tubes also inspection of safety devises, which included pressure relieve valves etc. Trained new comers in the mechanical aspect of O/M.(steam, coal and oil) (Fuel nozzle assemblies)& (combine cycle) Experience with replacement and installation of scrubbers dual circle boilers. Heavy industrial on single dual cycle from 150 mw to 600 mw power plants. Right-hand person to engineers and project managers to prepare engineering drawings, developing specifications, evaluating scope of work, and assigning project task. Modular CFB Coal 1 x 340,10 TO 70,MW, 1 x 37MW, Gwf power systems 5x20.5 mw, 2x25 mw. Modular CFB BOILER, superior performance burning. Tires (Indian coal, bituminous coal, brown coal, solid waste, anthracite, petro cork, delayed cork, fuel pet cork, powder coal, and biomass).
I saved a key account with Disney World by identifying, locating, and repairing boiler damage in record time. This job was Typhoon lagoons 36 in. pipelines. The main line from Boiler to Lagoon was leaking in all joints. When I met with the Engineers from Disney they wanted to pull the bond. I asked them to give me a few hours to assess the situation and after reviewing I recommended abandoning and replacing entire pipelines. I had to get equipment, man power and consumables and finish the project within 8 days. I worked 2 shifts, 24-7 and met the deadline to bring the Lagoon back into Operation.
Experience continued
Kelly Air Force Base_- San Antonio, Texas Boiler Mechanic Supervisor
Manage the maintenance and repair of all base boilers. Supervised and trained 18 mechanics. Manage the maintenance and repair of four 150 mg steam boilers, which comprised maintaining steam lines and traps. Set up work orders and assigned mechanics to each job. These jobs were through out Kelly Air Force Base & Lakeland (AFB).There was 25 thousand employees in the entire base from Commanders, Offices and civilian personnel. All the buildings in the base had their own individual steam system. In addition I had to go out and inspect all jobs and make sure that all work order was done properly.
Kelloggs Engineering , Saudi Arabia Pipeline Supervisor: Overseeing installation, QC, and scheduling Pipeline production. Supervised and trained 125 welders, pipe fitters, and general laborers. My job consisted of pipeline and pumping station from the oil fields transferring crude oil from the port of Jeddah, and from Medina to the port of Yanbu al Bahr. Also installation and maintenance of pumping stations and transferred from the outer oil fields of Makkah, Al Madinah. I interface with construction managers and engineers.
Daniels Construction Seadrift, Texas QC 100% X-Ray Inspector Non Destructive
Boiler Construction Kingston, Jamaica Pipe Foreman: Installation of Water wall Boiler, for industry of Box side Mining
Brown & Root San Juan, Puerto Rico Pipe Welder/100% X-Ray Non-Destructive: Pipe Installation and Welding
H.B. Zachary Caribbean Division and San Antonio, Texas Pipe Welder / Lead man: Pipe Installation and Welding
Certifications and Awards:
Certificate in Quality Participation Employee Course United States Air Force 100% X-Ray Non Destructive Certificate in Flame Safeguard Controls & Boiler Safety Controls Service Tech Supply Certified in: (MSHA) Mine Safety and Health Administration CERTIFICATION- NDT, MT-II, PT-II, RT-II, UT-II-A, VT-II CERTIFICATION- ASME- B31.1
TIG 308 Stainless 6010 Carbon Steel Sub ARC 7018 Low Hydrogen
Awarded for Notable Achievement United States Air Force
Awarded for Outstanding Service San Antonio area Combined Federal Campaign
Roberts Technical School New York, New York
Course in TIG, MIG and STICK
Personal: Fully Bilingual in Spanish and English
|