RESUME OF GAYLAN R ANDERSON PH: (918) 360-3128
QUALIFICATIONS
Heavy highway and dam construction most of my life. Built projects from the ground up starting at $100,000 up to seventy million. Primarily been in excavation and asphalt paving, with some concrete paving and bridge experience.
EDUCATION
Associate Civil Engineering Degree, Eastern Oklahoma A&M AGC OSHA Training Certification CORP of Engineers Certification for Construction Quality Control
EMPLOYMENT
AIG BAKER, Built a 58 acre Shopping Mall in 2007 in Sparks, Nevada. Project Manager for 2 years 2007 and 2008, on a 38 million grade, drainage and paving project. (Water, sanitation, gas and electric) 45 sub-contractors. Mr.Ron Cryer, Sr. Project Mgr.(205)960-8803
GILCHRIST CONST., Alexander, LA; General Supt., on a 16 million grade/drainage project 2005 and 2006. Ref: Mr. Mike Hudnall (318)715-7647 Operations Manager.
DIAMOND B CONST., LLC, Alexandria, Louisiana. General Superintendent on a $73 million project; grade,drainage, paving for the SE District, Amite Division,(managed 4-6 crews) from September 2003 to August 2005. Mr Mitchell Black, Area Manager, (985)215-8676
BROCE CONSTRUCTION CO. INC., Norman, Oklahoma. Area Superintendent for the Southwest District of Oklahoma from May 2001 to the present, 11/2002. I had 9 projects active with 8 in penalty when I came aboard with Broce.
MCANANY CONSTRUCTION, Inc., Shawnee, Kansas. Project Manager for one year, 1999. Coordinated 18 subcontractors on a $7 million dollar mile of road that included dirt, concrete, in-house asphalt and two bridges.
BROWN & BROWN, INC., Salina, Kansas. Project Superintendent for two years, 1997 and 1998, overseeing asphalt and soil reclamation.
ALTA PACIFIC CONSTRUCTORS, Inc., Omaha, Nebraska. General Superintendent from 11/95 - 9/1996, on a $7 million highway job and $4 million Wolf Creek Dam project. Midwest Division was closed out.
JIM FANN CONSTRUCTION, Flagstaff, Arizona. General Superintendent until June 1995; ran three jobs covering 380 miles on a daily basis. Clarkdale, Arizona - City Streets; resurfacing 44 miles of I-40 West of Flagstaff; resurfacing the roads and bike paths at the Grand Canyon. Mr. Fann had the bonding company ready to step in and he hired me to get the job done as much as possible before they arrived. He sold out after this job.
SHAWNEE ASPHALT CONSTRUCTION, Shawnee, Oklahoma. General Superintendent for three years. Highway and commercial construction. In charge of all phases which included dirt work, concrete boxes, pipe installation, asphalt and concrete paving; all subgrade and base preparation. President, Don Hearst.
|