Name : steamer
Industry Type : Engineers
City & State : mcallen, tx
Job Title facilities manager
Relocation Preferences : arizona/oklahoma
Objective : facility managment building managment
Resume :  
Steve Edge P.E
210 401-4207
956 424-7516







CHIEF ENGINEER, FACILITIES MANAGER, MAINTENANCE SUPERVISOR,
OPERATING ENGINEER
STATIONARY ENGINEER UNLIMITED HORSE POWER

LICENSED PROFESSIONAL ENGINEER
LICENSED ENGINEER 25 YEARS ILLINOIS.
LICENSED ENGINEER 16 YEARS WISCONSIN.
LICENSED ENGINEER 5 YEARS OKLAHOMA.
ENERGY MANAGEMENT CERTIFIED.
HOMELAND SECURITY CERTIFIED.
WELDING PIPEFITTING CERTIFIED .
HVAC CERTIFIED.

LIFE MEMBER OF IUOE #399,WBIA,NFPA,ASHRE, PAST MEMBER OF CHICAGO
CHIEF ENGINEERS ASSOCIATION ,NAPE,NIULPE,BOMA AND BSA.



EMPLOYMENT
MAY 2007 THRU PRESENT , DOCTORS HOSPITAL AT RENAISSANCE.
I HOLD THE TITLE OF TECH 111 IN THIS SUPERVISORY POSITION I
HAVE THE DUTIES AND RESPONSIBILITIES OF DAY TO DAY OPERATIONS AND
REPAIR OF HEAVY EQUIPMENT COOLING AND HEATING SYSTEMS OVERSEEING
FUNCTIONS OF PLUMBING ELECTRICAL INSTALLATIONS AND REPAIR .ENERGY
MANAGEMENT SYSTEMS, VAV BOX CLIMATE CONTROL ,FIRE SYSTEMS
INVENTORY CONTROL IAM ALSO A MEMBER OF THE RAPID RESPONSE TEAM.
I WAS VOTED EMPLOYEE OF THE MONTH FOR JULY 2008.


RML Specialty Hospital
NOVEMBER 2005 THRU FEBRUARY 2007,STATIONARY ENGINEER BOILER
ROOM OPERATOR. I WAS RESPONSIBLE FOR GENERATOR LOAD TESTING
FIRE SYSTEM TESTING FLOW AND TAMPER SWITCHES, HIGH PRESSURE
OPERATIONS OF 3 WATER TUBE CLEVER BROOKE OPERATING AT 120PSI
CHEMICAL TESTING AND WATER TREATMENT, TROUBLE SHOOTING
AND INSTALLATION OF ALL ELECTRICAL PLUMBING AND SWITCH GEAR
RELATED TO THE OPERATIONS OF THIS FACILITY.ICE MACHINE REPAIR
AND ALL BUILDING MAINTENANCE ISSUES THAT AROSE THROUGH
OUT THE SHIFT.

MARCH 2000 THRU NOVEMBER 2005. NORTHWESTERN MEMORIAL HOSPITAL
I HELD THE POSITION OF STATIONARY ENGINEER 1ST CLASS,POWER HOUSE
OPERATOR, AND STERILIZER MECHANIC, I WAS RESPONSIBLE FOR THE
AND EFFICIENT OPERATIONS OF A 2 MILLION SQUARE FOOT COMPLEX.
I DID THE PIPEFITTING WELDING AND FABRICATION ON ALL HEAVY EQUI PMENT
INSTALLATION OF NEW EQUIPMENT ,REGULATING CLIMATE CONTROL THRU
JOHNSON METYSIS SYSTEMS, AIR HANDLER FILTER CHANGES OPERATING
A POWER PLANT CONSISTING OF 5 600 HORSE POWER BOILERS PRODUCING
20,600LBS OF STEAM PER HOUR. I GAVE INSTRUCTION TO SURBORNATES
ON PROPER PROCEDURE FOR WINTER lies UP AND TUBE PUNCHING OF
BOILERS AND CHILLERS. I ALSO OPERATED THE CHILLER PLANT AND WAS
RESPONSIBLE FOR THE AIR HANDLING EQUIPMENT PNEUMATIC CONTROLS
AND TUBE SYSTEM CHILLED WATER CONDENSER SYSTEMS PUMP AND SEAL REPAIR
HEAT EXCHANGERS VAV BOXES AND P/MS ON PUMPS .
I ALSO TOOK ON A NEW CHALLENGE OF STERILIZER MECHANIC.



MAY 1995 THRU FEBRUARY 2000 CHILDRENS MEMORIAL MEDICAL CENTER
I WAS RECRUITED AS ENGINEER FOR A NEW COMPLEX FOR CHILDRENS I
CAME ABOARD TO OVERSEE ON GOING CONSTRUCTION AND FOLLOW
UP ON PUNCH LISTS ASSOCIATED WITH THE CONSTRUCTION PROJECT .
UPON COMPLETION I WAS GIVEN THE WESTCHESTER ILLINOIS FACILITIES
WITH FULL REIN OVER BUILDING AND GROUND OPERATIONS WITH THE DUTIES
AND RESPONSIBILITIES ASSOCIATED WITH EMPLOYEE ISSUES HIRING PROMOTING,
EVALUATION, BUDGET PREPARATIONS FACILITY ASSESMENT TO DETERMINE
SYSTEM UPGRADE ,WITH MY BACKROUND IN ENERGY MANAGEMENT I WAS
THE LAISON FOR ALL SYSTEM MODIFICATIONS DESIGN . I ALSO HAD THE DUTIES
OF INVENTORY CONTROL, SAFETY AND SECURITY ISSUES FIRE SYSTEM OPERATOR
AND FIRE DRILL ORGANIZER GENERATOR OPERATOR. AS WELL A CONTRACTOR
ORGANIZER, AND ASSURING ALL BUILDING AND PROPERTY ISSUES WERE COMPLETED
IN A TIMELY COST EFFECTIVE MANNER WHILE ASSURING ALL REQUIRED DOCUMENTATION
WAS PROPERLY ASSESED AND STORED,



Nov 1994 thru April 1995 Sheraton Hotel Madison Wisconsin.
I was hired as assistant chief engineer taking on the responsibility of organizing
The engineering and EVS departments this was achieved by the selection of specialty
Craft people assigned to each trade which made it more cost effective my achieving
Work in house and not out sourcing



Jan 1987 thru 1992 Michael Reese Hospital and Medical center
I had the responsibility of operating the steam power plant . We generated for the entire complex which consisted of 31 buildings, we had coal fed water tube boilers with chain grade stokers supplying our fuel, I was also responsible for all a/c and chiller operations tube system which consisted of 5 miles of travel , I gained the position of lead engineer and was given the position of fire responder on the fire brigade ,safety ,elevators employee and patient issues also fell under my designation.
1983 to 1987 Olympia and York development.
I served my apprenticeship. We were a 63 story office condominium and department store .I Started there at ground breaking and stayed until I became a licensed engineer.

Willing to relocate.












.








A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.