Objective : |
Dear,Mr/Miss TO :HRD As I know that your company job in oil and geothermal industry,I would most be- Gratefully and ready to joint in your company as maintenance,electrician ,mechanic, Instrument,and steam filed operator. As an educated and experienced basic electrician,i have graduted from technical high School (3 year program curriculum) garut west java Indonesia My working experienced has been nine application work. I have worked : Power generation project,power generation geothermal,air drilling and electric.maintenance. in drilling, power plant building. For your reference,i here with enclosing curriculum vitae and resend photograph. Any other document if need will be handed soon. Your kind consideration is high appreciated.
Best regard
BUDI KUSUMAH
|
CURRICULUM VITAE
NAME : BUDI KUSUMAH DATE AND OF BIRTH : GARUT 11 FEBRUARY 1973 NATIONALITY : INDONESIA RELIGION : MOSLM SEX : MALE MARITAL STATUS : MARRIED ADRESS : KP.KUDANG.RT.02.RW.02 DS.LEBK JAYA. KEC.KARANG PAWITAN.GRUT. WEST JAVA-INDONESIA PHONE NUMBER : (+62262 240665) MOBILE PHONE : +62 85860860768 or +62 85223355097
PERSONAL HISTORY
A. EDUCATIONAL BACKGROUND YEAR OF GRADUATED
* ELEMENTARY JUNIOR SCHOOL 6 YEAR IN GARUT WEST JAVA * JUNIOR MAJORING SCHOOL 3 YEAR IN GARUT WEST JAVA * SENIOR TECHNICAL HIGH SCHOOL 3 YEAR IN GARUT WEST JAVA
B. TRAINING PROGRAMS TYPE HELD BY PLACE * EART GROUND TESTER SATURN GEO PT. BOOSING AMOSEAS INDONESAI MEGAH * OPERATOR AND HIGH AND LOW PT.DESCONAYASA AMOSEAS MAINTENANCE VOLTAGE * H2S & RESPIRATORY DETEKTOR,SCBA PT.PANDU SLAMET AMOSEAS * FRIST AID BASIC LIFE SUPORT PT.OGSPIRAS AMOSEAS BINA DRRING * DRIVING SMITH CAR PT.ADHI KARYA ADHI KARYA
C. SKILLS
* COMPUTER LITERATE: MS EXCEL, MS. WORD, MS POWER POIN, CHTS * LANGUE: INDONESIAN AND ENGLISH D. WORKING EXPERIENCES 1. Working Company: PT.MERAWANG PUTRA Periode And Service: 14 December 1993 up to 29 November 1994 Final Classification: Electician/Rigeleatrie & Maintenance Company Location: Drajat Geothermal Garut West Java Reasen Living: Finish Contac
2.Working Company: PT. DESCONA YASA Periode And Service: 1 December 1995 up to 15 December 1996 Final Classification: Electician Company Location: Drajat Geothermal Garut West Java Reasen Living: Finish Contac
3.Working Company: PT. KOKUSAI KEISO INDONESIA Periode And Service: 17 August 1997 up to 31 October 1997 Final Classification: Termination Coordinator Company Location: VGIJ-1Project, Jagageka II Cikarang Reasen Living: Job Completion.
4.Working Company: PT. TETRA NUSA IDAMAN Periode And Service: 15 May 1997 up to 5 September 1998 Final Classification: Rig Electician Company Location: Salak Geothermal Sukabumi West Java Reasen Living: Job Completion.
5.Working Company: PT. BOOSANG INDONESIA MEGAH Periode And Service: 1 August 1998 up to 28 July 1999 Final Classification: Electician Company Location: Darajat Geothermal Power Plant Garut West Java Reasen Living: Job Completion.
6.Working Company: PT. ARIEF DUTA PERSADA Periode And Service: 1 August 1999 up to 19 December 1999 Final Classification: Electician I Company Location: PT. YOSHIKAWA ELECTRONIC BINTAN PROJECT Reasen Living: Job Completion.
7.Working Company: PT. PASIFIC PRESTERSS INDONESIA Periode And Service: 7 July 2004 1998 up 7 April 2005 Final Classification: Operator Tower Crane Company Location: Pengembangan Kawasan Pemerintah Kota Cimahi Bandung-Jawa Barat Reasen Living: Job Completion.
8.Working Company: PT. ADHI KARYA (Persero tbk) Periode And Service: 11 July 2005 up to 28 May 2007 Final Classification: Supervisior Mecanic/Electrie Company Location: All Project PT. Adhi Karya Sarana Penunjang Produksi (SPP) Reasen Living: Finish Contract.
9.Working Company: CONSOLIDATED NCONTRACTOR COMPANY Periode And Service: 11 June 2007 up to 15 June 2008 Final Classification: Electrician Company Location: Kursaniyah Gas Plant Plant Reasen Living: Finish Contractt
E. DATIES AND RESPONBILITY A.Perpentive maintenance for transformer, 96 MVA (13,8/150 KV) 2 x 2000 KVA (6,3 KV/4000 V) 8000 KV (13,8/6,3 KV) and 25 KVA (6,3 KV/400 V) B.Modicated edditional, Transformer, Cooling System, ONAF for 96 MVA Transformer, PT, Pouwel Transfoemer. C.Trauble Shooting for electrical transformer control system, Insulation resistence test for LV & HV busing by Mega-OHM (MEGGER) type 5100, AEMC Instrument
SWIEH YARD A.Propentivo and Prodective Maintenance for 150 KV, CB, ES/DS, CVT and Ligtening Cevester clearing for all terminals comneetion of ES/DS and trasformer STDA sehedule. B.Contact Resictence Test for LV & HV, CB, BY Micro OHM meter type 5600, AEMC C.Training countac 3 fast on CB (Cuite Breaker) D.CTV control oil and sf 6 rage for distconection switch. ELECTRICAL MOTOR A.Prefentip and Reductive maintenance for LV & HV and MV motor B.Connection 1 and 3 fase Star and Delta connection motor. C.Perform insiall cable connection and wairing motor. D.Classification motor, type A,B,F,H and ETC PROTECTION RELAY PANEL AND GENERATOR A. Orepentive maintenance and measuring included taken electrical dataes voltage Current ,load and calculated from LV(ct/cp)side 150 KV relay protection. B Cleaning and lightening for electrical connection bush bar,on STDA schedule C . Daily reprt, weakly and mountly control 150 KV and Bush dak. GENERATOR A.trouble shooting for 13,8kv/110 v current transformer of generator main bus B. preventive predictive maintenance for,13,8 kv generator .perform measuring included taken electrical daties voltage ,current, load ,calculated from LV (ct /pt side for 13.8 kv generator C. resistance test for generator EXSITER PNG by mega ohm meer insulation,type 5100 AEMC instrument on STDA schedule D. winding insulation resistance for generator by mega ohm meter LIGHTING SYSTEM AND 380 VOLT/6.3 TRANSMITION LINE COMISIONING A. Perform instaled new and editional termination for lighting and panel all building B. check and repaired for cut out fuse link and lightening arrester,fulling cable, for install lighting, C. measure specipic lighting for LUX meter D. pabrication and wiring lighting and panel
JOB DISCRIPTION INTRUMENT AND OPERATON PRESSURE,STEAM A. install ITT barton charge and pressure gauge ,tubing line B. reading and calculation recort dateas PSI and BAR C. calibration test gauge,valve,and pipe line D.joint valve instrument, E hydro tes pipe line and flow line size 7,5 bar F report set poin MAWP(maximum allowable working pressure) PSH and PSL G. calculation discharge and section pressure or steam for steam heather H.operation control valve manual or automatic I. repaired and maintenance pipe line drain steam
ETC
* I have certivicate letterfrom PT OGSPIRAS BINA DRILLING of Safety Award over 100 days and Lost eccident free days
REGARD
BUDI KUSUMAH
|