Humberto R. Castillo, P.E. Electrical Engineer 16401 Cypress Water Way. Tampa. Fl 33624. Phone: 813-325-4894. Email: TampaHumberto[at]aol.com
I am looking the job opportunity to work as Electrical Engineer for willing to bring all my experience to ensure that all the projects designed in compliance with latest codes and regulations, and be performed in a cost-effective manner, that contributes to a safe working environment and adequate reliability.
Skills and Experience
Experienced in development of the electrical drawings and specifications with emphasis on code compliance, technical correctness, and ability to satisfy client needs. More than seven (7) years of progressive work experience in the electrical engineering field is required. Knowledge of FDOT or public works roadway lighting experience required. FOT * Highway Mast lighting and Roadway lighting.
Electrical Computer Aided Design (CAD) designer able to develop complex working drawings for equipment specifications, engineering notes, sketches and/or existing drawings to ensure they meet applicable standards and codes (ANSI, IEEE and NEC). Experienced in electrical project design and deliverables that include standard location plans, layouts, and schematics, grounding and single lines. Specialized in the electrical design of buildings (lighting/power/systems).
Education
1995- 1996 HITECH .Miami. Florida Computer Technician. 1983 1988 ISPJAE. Institute Superior Jose A. Echevarria. Havana. Cuba Majored in Electrical Engineering 1981 - 1983 Hermanos Gomez. Electrical Technician. Registrations
Professional Engineer in Florida & Iowa States
Bayside Engineering Inc., 2007 to 2008 Senior Engineer.
Specialized in project design and field inspection of electrical systems. Evaluated, selected and applied standard engineering techniques, procedures and criteria, using judgment in making minor adaptations and modifications. Performed work involving conventional types of plans, investigations, surveys and structures with relatively few complex features. Responsible for preparation and completion of discipline engineering designs. Coordinated the preparation of design details, plans and drawings within the assigned task areas or scope. Negotiated services and staff hours, provided review and comments to design plans prepared by others, and coordinated with local governments and non-public entities. Supervised, scheduled, coordinated and monitored work of project team members. Worked closely with other disciplines on multi-discipline projects.
.KEM, 2007
Electrical Project Engineer Design of Power, Lighting, Fire Alarms Systems for Health care, Industrial and Residential Facilities.
MTD Industrial. Engineer of Record. Industrial Power, Ligting, and Fire Alarm Design for a total of six warehouses. Electrical Designer for Residential Buildings, Pool Lighting Design, Street Parking Lighting Design, Security Systems and Gates. Electrical Designer for Health Care Facilities, and particpayed in AHCA Inspections. Coordinated with utility company for provide new metering services and demolish and replace existing service entrance power services.
PBSJ, 2003-2007 Senior Engineer
Designed of power, lighting, data, phone and fire alarms systems design for new PBSJ office in Tampa. Award 2007 IIDA Projects West IESNA Section in Florida.
Manages one or more phases of large public related projects of pre-construction or development. Signed and sealed design, calculations, specifications, reports and other engineering data. Supervised the review of engineering documentation or compliance program where the professional engineer; seal electrical work as necessary. Provided internal professional designs and proposed acquisitions; project assurance of correct analysis, timely comply.. Specialized in FDOT roadway lighting design. Prepared Lighting Justification, Lighting Design Analyses Reports. Experienced in the review of Aeronautical Evaluation Report for Roadway Projects Lighting within 10 miles of an airport. Engineer of Record for Clearwater Beach walks Project. Lighting & Power Design for Clearwater Beach. Designed power service entrances grid for existing and new facilities, landscaping, traffic signs, outdoor lighting, and others type of facilities. Provided power electrical design services for sizing conductors and conduits to provide power for all news and existing facilities inside perimeter of Beach walk Project (hotels, guard houses, in addition of landscaping equipment, traffic signals, parking lots security systems, outdoor lighting, etc) Provided review comments to more that 50 roadway lighting projects submitted by more than 12 consultant-engineering companies and provide support to field construction in the cities of Naples, Fort Myers, Punta Gorda, Sarasota, and others cities locate in Polk County. Designed lighting project for 12 berths at Port Manatee. Coordinated with utilities for service power to proposed new services of roadway lighting.
Estimated damages of hurricanes Charles, and others for FEMA for the cities of Arcadia, Punta Gorda, Okeechobee, and Wauchula.
URS, Tampa. 2001-2003 Electrical Project Engineer Design of Power, Lighting, Fire Alarms Systems for Health care, Industrial and Residential Facilities.
Buena Vista Drive Widening for Walt Disney World, Orlando, Florida Curlew Road Justification Lighting Report, Pinellas County, Florida Disneys Lake Buena Vista Drive, Orlando, Florida Roadway and pedestrian lighting design, conversion of existing roadway lighting project from 240/120 volt to 480/280 volt, installation of pedestrian poles to illuminate sidewalk. Electrical project design for Toll Facilities.
Alliant-Energy, Iowa. 1999-2001 Power Distribution Engineer . Power Distribution Engineer Expertise in Power Quality and Conservation Energy and Fuse Coordination (SCADA Systems). Specialized in studies of power quality and conservation energy for industrial, commercial, and residential facilities.
EMTEC & Florida Engineering Services. 1997-1999 Electrical Project Engineer.
Design of Power Systems, Lighting, Communications, Alarm Systems, and Lighting Protection for Commercial and Residential Facilities and High Riser Buildings. Electrical design of the Dealership: The Collection, Coral Gables, Florida; project engineer Television Facility: Fonovideo Productions, Inc., Miami, Florida; chief engineer.
Coulter Electronic & Future Tech 1995-1997. Electronic Technician Specialized in troubleshooting and testing electronic equipment
Electric Company Havana & IPROYAZ 1988-1995 Electrical Project Engineer Power & lighting design of sugar factories.
Courses/Seminars
Maintenance of Traffic. Intermediate Level Training Course. FDOT. Jan 11, 2006 Arc Flash Hazard Analysis- The basis. Red Vector. Nov 12, 2006. Electrical Characteristics of Conductors. Nov 12, 2006. Red Vector. 2005 NEC: Swimming Pools, Fountains & Similar Installations. Red Vector. Understanding Electrical Rates. Sept 28, 2006. Red Vector. Building Code Administrative Core Online, Sponsored by the Florida Building Commissioning. Sept 19, 2005. Leadership Course, Red Vector, (1 hour) August 20, 2004. 2005 NEC: Wiring and Protection (3 hours) February, 7, 2005. Interior Lighting 7: Luminaries, Sept 20, 2005. Red Vector. Florida Engineers Laws and Rules, April 24, 2006. Contract for Professional, Red Vector, April 14, 2006. 2005 NEC: Fixed Electrical Space Heating, AC & Refrigeration Equipment, Red Vector, February 03, 2006. 2005 NEC: Health Care Facilities & Theaters, Red Vector., Dec 09, 2005 Wiring & Protection, Red Vector. August 10, 2005 Grounding Practice and Power Line Disturbance, January 16, 2006. Web Marketing and E- Commerce, December 11, 2004. USF. GRN- Grounding for AC and DC Electrical Distribution Systems. Certificate of Completion Lighting Course in Advance Roadway Seminar with Holophane, 2004. Source Cooper Lighting Center, June 24, 2004. Certificate of Training in Surge Protection Considerations with LEA International, 2004 Design Update Training by Florida Department of Transportation, 2002 Certificate of Training Basic Highway Lighting & Electricity by Florida Transportation Department, 2002 Safety Traffic Certification of Completion Intermediate Level Training Course by Florida Transportation Department, 2002 Certificate of Training in Contemporary Topics in Power System Harmonics by Pellissipi State Technical Community College, 2000 Certificate of Training in The Distribution System Over current Protection Workshop and Symmetrical Components Tutorial with Cooper Power Systems, 2000. Tate Access Floor, KINGSPAN Group PLC, July 26, 2005. Sustainability in Masonry Construction and Keys to Successful Pre-Construction Testing and Field Testing of Exterior Wall Mock-ups. January 12, 2006. Achieving Speech Privacy in Open Plan Office. Florida Sound Masking, Inc. Nov 11, 2005.
|