Richard E. Freitag 8498 Laurel Lakes CV Naples Florida 217-725-3345
Education: Williamsville High School Lincoln Land College Lake Land College
Employment History:
Local 965 Operating Engineers 2007 2008 Springfield Illinois
Halverson Construction, Heavy equipment operator McCarther extension projects. Kenny Construction Heavy equipment operator, City Of Springfield Patch Project.
Freitag Contractors 2007 2008 Riverton Illinois
Remodel project North Pekin Illinois, commercial Nail salon. Demo work, place fire proof divider wall, install bath room addition, place new plumbing and electrical for lighting and Nail chairs, install ceramic tile, doors, and trim work. Estimate project, payroll, order materials.
Stark Excavating 2005 2007 Bloomington Illinois
Duties include project manager / superintendent for work crews, supervise up to twelve jobs at a time with 30 employees at one time, time sheets, daily production reports, cost tracking per job, material ordering and delivery schedules, equipment scheduling, assign operators and laborers to jobs, insure safety on all jobs at all times. Hire. Fire, layoff unproductive workers. Assure that production, quality of workmanship, time schedules meet deadlines and completion dates as per contracts, lay-out jobs, set up GPS base stations and down load GPS site maps to laptop and GPS equipment. Meet with owners and representatives of projects (City, County, Owner reps.) Operations for earthwork Division (Local 965 Operating Engineers)
Siciliano Inc. 2002 - 2005 Springfield Illinois
Duties include project manager, supervisor of work, heavy equipment operator, over see equipment usage, estimator for water, storm, sanitary sewer, earth work, infrastructure work. (Local 965 Operating Engineers)
Ryan Eastern 2001 2002 Deerfield Beach Florida
Duties included Superintendent for earth work division, Time cards, heavy equipment operator for excavators, off road trucks, scrapers, dozers, backhoes, lay-out for cut and fills, job cost tracking, ordering materials and equipment and equipment usage.
Freitag Contractors 1999 2001 Riverton Illinois
Owner Operator, union contractor, specializing in roads, parking lots, underground infrastructure, storm and sanitary sewers, concrete work, demolition, city street scapes projects, sub contractor fro bridge work and roadway work.
Illinois State Police Part Time 2001
Office work, criminal background checks general office duties
Sankey Construction 1994 1999 Springfield Illinois
Duties included estimator fro private, state, county and city work, superintendent for asphalt crew, QCQA material testing, finaling out jobs with the state and city, density testing, infrastructure work, concrete paving, concrete curb and gutters (hand and slip form) subdivision construction, asphalt paving, storm and sanitary sewers, earth work.
Richard Freitag 8498 Laurel Lakes Phone # 217-725-3345 Naples Fl. 34119
Employment History
2007 2008 Local 965 Operating Engineers Springfield Illinois
Heavy equipment operator, excavators, dozers, trenchers, backhoes, skid steers, earthmovers, challengers. GPS training. Work includes sewers, storm and sanitary, water main, building footings, site development, roads and bridge work. Large site work to 1000000 c.y sites, ponds construction, slope work, interior underground plumbing.
2004 2007 Stark Excavating Bloomington Illinois
Project manager / Superintendent. Oversee 5 to 14 jobs at once, direct work crews, keep track of job cost, set up equipment and material deliveries, employee time sheets, daily reports, site lay-out, GPS set up on equipment, Base station set up, plan review. Work consists of earthwork, storm and sanitary sewers, water main construction, subdivision construction, roadway projects, sewage lagoons, commercial site development. 1000 to 400,000 C.Y. excavation projects, cost range from $50000.00 to $4,000,000.00 (local 965 Operating Engineers)
2002 2004 Siciliano Inc. Springfield Illinois Project manager / Superintendent / Equipment Dispatcher / Estimator. Over see 5 to 10 jobs at one time, direct work crews, call union halls for man power, order materials, estimate jobs, review job estimates with owner, turn in bids, track job cost, attend weekly progress meetings, fill in heavy equipment operator, lay-out of jobs, daily reports and time cards for payroll, dispatch heavy equipment to jobs, track equipment maintenance, Work with city, state and private commercial development, site development, sanitary sewers, water mains, earth work, lift stations. Cost range from $10,000.00 to $1,000,000.00 (Local 965 Operating Engineers)
2001 2002 Ryan Eastern Deerfield Beach Florida
Superintendent for earthwork division, manage day-to-day field operations, review plans and job estimates for projects, track job cost, keep daily time sheets and payroll. Job site layout, attend weekly progress meetings, attend weekly owner rep. meetings, and fill in heavy equipment operator. Jobs consist of site development for commercial, subdivisions construction and roadwork. Cost range from $200,000.00 to $2,000,000.00
1999 2001 Freitag Contractors Riverton Illinois
Owner / Operator / Estimator, work consist of estimating ( HCSS software ) ordering materials, ordering and scheduling trucking, heavy equipment operator, payroll, equipment matenace, equipment financing, office duties, owner, rep meetings and progress reports to owners, accounting. Jobs consist of city, state, county work. Bridge / box culvert construction, demolition, concrete work, earth work, building footings earth work, school construction, roadways and commercial construction. Cost range from $10,000.00 to $150,000.00
1994 2001 Sankey Construction Springfield Illinois
Estimator / Superintendent / QCQA Material Testing, work consist of State D.O.T. work, county, city, private earth work, storm and sanitary sewer construction, asphalt paving, concrete construction, asphalt mix design, material testing, plan review, estimating, superintendent for paving crew. Job cost Range from $50,000.00 to $2,000,000.00
Richard Freitag Education / Class Courses Attended
Course Description
Tech Mathematics Business Law 1 Standardized Unit Architectural Planning Utilization of Concrete and Masonry Developmental Architectural Construction Principals and Mechanical Wood, Steel and Alum. Intro to Computing T.A. Architectural Drafting Standards Of Planning Architectural Free Sketching Graphic & Analytic Fund Comp and Drafting Architectural Specifications Dev. Alg. American Politics Composition 1 Lotus 1-2-3 Aggregate mix designs For Concrete and Asphalt Asphalt Level One Mix Design ( D.O.T. ) Concrete Mix Design ( D.O.T. )
Other Classes
Computer Estimating ( HCSS Heavy Bid ) Lotus 1-2-3 Microsoft Office Quick Books Pro. Trimble GPS Set Up ( Chicago )
Other Classes / Certificates
Troxler Nuclear Safety O.S.H.A/ Safety 10 Hr. Asphalt Level 1 and 2 A.C.I. American Concrete Institute Level 1 ( D.O.T. ) C.P.R. / First Aid Trimble G.P.S. set up ( Base and Equipment )
Self Help Study
Business Law Incorporation Law Accounting and Financing Commercial real estate Financing Business management Commercial Property Management Broker and Commodity Studies
|