BRIAN K. JACKSON / EAGLE EYE CONSULTING______________
OBJECTIVE__________________________________________________________________ To obtain a position that will utilize my extensive experience and technical capabilities in the Energy /Utilities and Pharmaceutical Industry.
PROFILE____________________________________________________________________ Senior process controls manager with excellent skills in multi-tasking and field management. With 27+ years in the utility industry covering: Maintenance, Overhauls & Automation of a Steam Turbine Driven 80,000 ton refrigeration plant and various 22 to 500 Mega Watt multi fuel electric generating facilities. Extensive experience taking large construction projects from the ground to start-up and commissioning. Frequently assigned to troubleshoot projects that are behind schedule to get things back on track with deadlines. Mr. Jacksons ability to positively motivate others as well as interact with both union and non-union personnel ensures a healthy and productive working environment to achieve customer goals.
Project and Site Management Steam & Gas Turbines Field Supervision Installation and Commissioning Instrumentation & Electrical I&C Technician
PROFESSIONAL EXPERIENCE_______________________________________________________ Site Manager/Technical Consultant Sanford, NC Eagle Eye Consulting / CRB Builders Inc at Wyeth Vaccines July 07 Dec 07
Site Manager for instruments and electrical for new construction. Monitored daily work progress to insure project timeliness. Restored customer confidence with the general contractor.
Provided status reports daily to the GC. Daily meetings with programmers for technical support and engineering roadblocks. Daily meetings with instrument/electrical foreman to review daily workload. Weekly meetings with Engineering and GC Management. Assisted in getting job on track with due dates to insure GC receives timely payments.
Technical Consultant Athens, GA. Eagle Eye Consulting / CES-Connor Engineering Solutions of Alpharetta, Ga. Jan 05-July05
Commissioning of a Level 3 Bio-Containment Research Laboratory. Building had to meet FDA Regulations for the study of Lyme Disease, West Nile & SARS at the University of Georgia.
Witnessing testing, inspecting installations, and providing guidance on commissioning activities on boilers, chillers, cooling towers, HVAC and emergency power. Participating in construction job meetings. Writing and organizing reports and documents of the commissioning. Coordinating daily commissioning activities for other technicians.
Project Manager/Technical Consultant New York City, NY Eagle Eye Consulting / Island Instrumentation & Controls / Con Edison March 04-Dec 04
Project Manager/Technical Consultant for the simultaneous installation of 2 GE-F7 gas turbine generators with HRSGS (360 Mega Watts)) in Manhattan, NY. Island Inst. was on site 1 year when I was brought in to evaluate and assumed position of Project Manager after 2nd week. Obstacles removed and confidence restored with all parties. Increased $4 Million project by $2.7 Million due to changes and excepting additional work.
Daily meetings with GC Superintendent and Trades Foreman. Managed crews up to sixty (60) subcontracted disciplines-Instrument Techs, Pipe & Weld Assisted with field controversies to keep projects progressing to meet schedule. Weekly meetings with Engineering & Customer. Assisted in getting job on track with due dates to insure timely payments.
Technical Consultant Charlotte, NC Eagle Eye Consulting / CES-Connor Engineering Solutions Alpharetta, Ga. July03-Nov 03
Performed a forensic study and commissioning of the control and electrical systems of 27 public schools in Charlotte, NC.
Provided reports and photos of as found data to school officials in regards to non-conforming construction specifications and functionality of newly installed systems for the purpose of taking legal action against multiple GCs. Performed inspection of electrical for code violations. Performed inspection of OEM specifications for violations.
Site Manager Sanford, NC Eagle Eye Consulting / CES-Connor Engineering Solutions/Wyeth Vaccines Nov 02-March 03
Contracted Technical support for Instrumentation & Controls Assessment. (Engineering) Contracted Technical support for Electrical & Mechanical Assessment. (Engineering)
Site Manager/Technical Consultant Long Island, NY GE Automation / GE Engineering Services / Long Island Power Authority June 02-Aug 02
Site Manager/Technical Consultant for the simultaneous installation of (10) TM-2500 GE Gas Turbines. (22 Mega Watts each) Managed crews up to one hundred fifty (150) Union personnel. Assisted with field controversies to keep projects progressing to meet 90 day deadline. Accomplished
Daily meetings with Trades Foreman/Project Manager/Engineering for 3 different locations. Insure that EPA Guidelines were followed. Hire qualified Union Instrument Technicians for start up. Rental units used for peak power.
Site Manager/Technical Consultant New York City, NY GE Automation / Slattery Skanska / New York Power Authority March 01-June-02
Site Manager/Technical Consultant for the simultaneous installation & calibration of 5638 Instruments and debug/start-up of eleven (11) LM 6000 GE turbines in New York City. (50 Mega Watts each) Managed crews up to forty (40) subcontracted disciplines. Assisted with field controversies to keep projects progressing to meet schedule. Increased $1.8 million project by $4.5 million on a Time and Materials basis.
Fast track; March 01 to July 18- goal was 9 turbines on 5 sites on line. Accomplished Assigned task of setting up temporary morgues for 9/11 disaster. Only trades manager with no punch list items. Supervised final debug of computer controls, graphics and operator training. Aced 2 audits for $6.3 million by GC and Customer (NYPA).
Contracted Technical Support Clayton, NC GE Automation / Bayer Pharmaceutical Jan 01-March 01
Contracted technical support for I&C check out, to successfully bring the facility back up within shut down limitations.
Contracted Technical Support Athens, Ga. GE Automation / Talka & Connor Engineering Alpharetta, Ga. Oct 00-Dec 00
Contracted technical support to lead check out, GMP calibrations and documentation for Level-3Bio-Containment Research Laboratory air systems and computer controls for the University of Georgia in Athens.
Provided reports and photos of as found data to state officials in regards to non conforming construction specifications and functionality of newly installed air systems for the purpose of taking legal action against the CG. This caused a 4 year court battle. Building had to meet FDA Regulations for the study of Lyme Disease, West Nile & SARS.
Apprentice / Journeymen / Senior Process Control Technician Rochester, NY Eastman Kodak Jan 83-Dec 99
Worked as a process Control Technician in the refrigeration and water utilities division providing maintenance and automation support throughout the Kodak facility. Worked as a member of team(s)to conceptualize, estimate, design, install, debug and commission large and small capital projects. (Minimum project, $17 million)
Maint., yearly over-hauls, Ins.inspections & automation of 45 Steam Turbines / Compressors. (Dresser-Rand, GE ,Murray, Allis-Chambers, Terry, Turbodyne / York,Trane, Frick, Carrier, GE) Automation of 37 Cooling Towers.(capacity 14,000 GPM each) Automation of a 60 million gallon a day potable water plant. Automation of Nitrogen & Compressed Air Plants. Automaton of safety controls for Chemical Tank Farms. Liaison for Refrig. & Water Dept. with Engineering, Construction, and Vendors. Supervisor / Trainer to newly hired apprentices. Troubleshoot computer programming and graphics. Assist in the writing of Safety Shutdown Logic for Rotating Equipment. AC/DC motor controls for 1HP to 750HP. Distribution of Utilities to over 100 buildings. I&C Drawing review for Field compatibility and maintenance.
Plant Operator Rochester, NY Eastman Kodak April 78-Dec.82
Worked in the daily operation of photographic paper manufacturing. Assisted Instrumentation Group in yearly shutdown maintenance.
EDUCATION__________________________________________________________________ 1974 RL Thomas High School--Completed-- Webster, NY
1981-1983 Rochester Institute of Technology, Rochester NY College Math
1983-1985 Instrumentation Apprenticeship Program (3yr.) Eastman Kodak, Rochester, NY
1985-Present Vendor Training/Technical Certificates Dresser-Rand Steam Turbines Murray Steam Turbines Woodward Electronic and Mechanical Governors Bentley Nevada Vibration Systems Boiler Efficiency Improvement PLC5 Programmable Controller Fisher Provox DCS Systems Ingersoll Rand Air Compressors York Refrigeration-2000 ton+ Performance Management Analytical Troubleshooting Statistical Quality Control Universal, Type-1, Type-2 CFCs Foundation Bus Training (Delta V Systems) Toshiba Variable Speed Drives Capital Controls Chlorine Gas Use & Safety
In House Training at Eastman Kodak Hazardous Waste Fire Training Chemical Hazard Communications Lock Out Tag Out Overhead Cranes Mercury Spill People Skills The Craft of Training Team Leadership Motors & Controls
|