GREGORY L. MEWHINNEY
WORK HISTORY
B & B Excavating PO Box 4870; 14955 HWY 6, Eagle, CO 81631 970-328-1617
Employed: April 2006- October 2008
Work performed: ASA lead man. I was responsible for running crew on various jobs.
Daily tasks:
1.Layout of job sites; 2.Cutting subgrade; 3.Placement of road base and blue topping for asphalt or concrete; 4.Ordering of equipment and trucking as daily tasks change; 5.Placement and trenching for; 6.Storm sewer; 7.Manholes and water quality vaults; 8.Culverts; 9.Shallow utilities
Other job tasks:
1.Roadway construction; 2.Layout; 3.Setting grade for subgrade and finish grade for road base; 4.Cutting subgrade; 5.Blue top road base; 6.Cutting slopes; 7.Cutting ditches; 8.Parking lots 9.Subgrade prep; 10.Base prep for asphalt and curb and gutter sidewalks; 11.Setting grade.
EQUIPMENT OPERATED
Blades: 143 H Cat 140 G Cat 14 H Cat 16 H Cat
Loaders: 966 G Cat 972 H Cat 980 H Cat 600 Komatsu 924 G Cat
Track hoes: 365 CL, C Cat 330 CL, C Cat 320 C Cat 50 C JD mini hoe 305 C CR mini hoe 345 C Cat.
Dozers: D10 R, Cat D9 R, T Cat D9 H. Cat D8 R, T Cat D7 H, R, R, Cat
Scrapers: 627 C, G Cat 615 G Cat paddle wheel 613 C Cat paddle wheel
Weeminuche Construction PO Box AA Towaoc, Colorado 81334-0009 1-970-565-7430
Employed: 2004-2005
Daily tasks: Equipment operator
1.Clearing, grubbing of cuts and fill in roadways; 2.Cutting and finishing of slopes and roadway(s); 3.Placement of fills in roadway(s); 4.Placement of road base and blue top for finish grade
Other jobs and tasks:
Basin Ridge project, Durango, Colorado
1.Construction of diversion channel; 2.Keyway for dam; 3.Clearing and grubbing for excavation; 4.Finishing slopes; 5.Snow removal; 6.Haul dirt.
Utah Department of Transportation, Devils Canyon South of Monticello, Utah
1.Loading rock (shot rock) into trucks; 2.Cutting and trimming slopes; 3.Road maintenance; 4.Finish work subgrade and road base; 5.Placement of culverts
EQUIPMENT OPERATED
Blades: 140 H Cat 14 H Cat
Dozers: D10 R Cat D 9 T, R Cat D 8 T, R Cat D 5 C, H Cat
Track hoes:365 C Cat 345 CL Cat 330 C, BL Cat 325 BL Cat
Loaders: 980 G, C Cat
Scrapers: 631 C, G Cat 615 C Cat, paddle wheel
Haul trucks:D 400 Cat D 350 Cat 767 Cat
Kirkland Construction 2101 Main Street Rye, CO 81069 (719) 489-3385
Heavy Highway construction west of Delta, Colorado Highway 50
Daily tasks:
1.Clear and grub shoulders and fills; 2.Load trucks with fill material; 3.Cut subgrade; 4.Cut slopes at cut areas; 5.Place fill material; 6.Pipe crossings (trenching)
Other jobs and tasks:
Highway 135 North of Gunnison, Colorado
1.Road crossings for culverts; 2.Place fill material; 3.Cut slopes; 4.Blue top subgrade and finish grade base.
Cerro Summit East of Montrose, Colorado
1.Clear and grub; 2.Maintain haul roads for scrapers and haul trucks; 3.Cut subgrade; 4.Blue top finish base grade
EQUIPMENT OPERATED
Blades:14 G 140 G 14 H Cat
Dozers: D 10 L Cat D 6 L Gp Cat
Scrapers: 631 C, G Cat 627 C Cat
Track hoes: Hitachi 450 345 C Cat 330 BL Cat
COURSES COMPLETED:
OSHA -01/08/2007 10 hour Occupational Safety and Health Administration
OSHA Standards (Excavations) 09/14/2007 Soil Identification Soil Analysis Hazard Identification Protective Systems Trench Shoring
REFERENCES
Ron Dufrene, Weeminuche Construction, 970-749-1074
Mike Fischer, Weeminuche Construction, 970-882-0187
Jim Yomans, Weeminuche Construction, 928-380-5403
Tony Daubs, Kirkland Construction, 719-251-6913
Chip Bair, B & B Excavation, 970-328-1734
|